Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 09, 2025 SAM #8444
SOLICITATION NOTICE

66 -- 66--TRANSMITTER,LIQUID, IN REPAIR/MODIFICATION OF

Notice Date
1/7/2025 1:06:19 AM
 
Notice Type
Solicitation
 
NAICS
334514 — Totalizing Fluid Meter and Counting Device Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010425QZA90
 
Response Due
2/6/2025 12:30:00 PM
 
Archive Date
02/21/2025
 
Point of Contact
Telephone: 7176051470
 
E-Mail Address
HOLLY.J.SMITH39.CIV@US.NAVY.MIL
(HOLLY.J.SMITH39.CIV@US.NAVY.MIL)
 
Description
CONTACT INFORMATION|4|N742.14|BXJ|N/A|holly.j.smith39.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specifications Section C and Section E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|CLIN 0001AA|2|365||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|TBD|W25G1U|TBD|N/A|N/A|N/A|N/A|N/A|N/A|See form DD1423 || NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|334514|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2.The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government?s acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. 4.If the offeror is not the Original End Manufacturer (OEM) of the material If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the offeror must provide a signed letter of authorization as a distributor on the OEM's letterhead. 5.If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 6.Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 7.Please provide repair price as Estimated (EST) for the full repair effort of the requirement. 8.Vendor shall have 90 days after receipt of carcass(es) to complete a teardown & evaluation (TD&E) of the carcass(es) and submit a Firm-Fixed Price (FFP) quote for the full repair effort of the carcass(es). 9.When submitting a quote, please include the cost of new (actual or estimated) for evaluation purposes. 10.Quote shall specify any exceptions including but not limited to MIL-STD Packaging, MIL-STD Labeling, Inspection & Acceptance locations, Packaging House, surplus materials, etc. If no exceptions are indicated or received, award shall be based upon solicitation requirements. Changes or requests for changes after award shall be subject to consideration costs deducted from the unit price. 11.In repair price, include all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information: a.Teardown & Evaluation Rate: b.Repair Turn Around Time (RTAT): c.Throughput Constraint: d.Induction Expiration Date: 12.PRICE REDUCTIONS a.Any asset for which the contractor does not meet the required RTAT will incur a price reduction of TBD per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government?s right to terminate for default. 13.The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. a.Requested RTAT: 125 Days 14.Quotes shall reference the proposed RTAT and any capacity constraints. \
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c7c2059b752d4f1a8556a3335f1c3c82/view)
 
Record
SN07307239-F 20250109/250107230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.