Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 17, 2025 SAM #8452
SOLICITATION NOTICE

Y -- B-21 LRS FUELS ADMIN/LAB AND REFUELER TRUCK YARD

Notice Date
1/15/2025 12:39:17 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W076 ENDIST FT WORTH FORT WORTH TX 76102-6124 USA
 
ZIP Code
76102-6124
 
Solicitation Number
W9126G24R0001
 
Response Due
2/28/2025 12:30:00 PM
 
Archive Date
01/15/2026
 
Point of Contact
Michael Fenwick, Phone: 8178861053, Bijay Gurung, Phone: 8178861018
 
E-Mail Address
michael.e.fenwick@usace.army.mil, bijay.gurung@usace.army.mil
(michael.e.fenwick@usace.army.mil, bijay.gurung@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Construct a new Logistics and Readiness Fuels Flight administrative and laboratory facility for the 7th Logistics and Readiness Squadron at Dyess Air Force Base consisting of administrative space, command space, laboratory space, physical control capability and proximity to the refueler truck yard. Construction includes a single-story facility with reinforced concrete drilled pier foundation, load bearing masonry walls, prefinished metal wall panels, standing seam metal roof on light gauge steel framing and interior finishes. The facility also includes laboratory fixtures including grounding rails, sinks, cabinetry, water filtration, vented enclosure, dedicated heating and air conditioning, drainage, base wide fuel system control interface, electrical, secure communications, a backup generator per Air Force Instruction 32-1062, mass notification system, fire suppression and alarm system. Supporting facilities include all utilities, detention pond for storm drainage, site improvements, pavements, communications infrastructure, special foundation due to local expansive soil, site demolition and other supporting work necessary to make a complete and usable facility. Storm drainage includes an area for temporary water retention. The existing fuels administration laboratory facility, B4111, will be demolished by a separate project in the following fiscal year. This project will comply with Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems. Facilities will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/ force protection requirements per Unified Facilities Criteria 4-010-01.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4ca5e88a5f2b48deb6d0883e9dc6e29a/view)
 
Record
SN07313714-F 20250117/250115230101 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.