Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 25, 2025 SAM #8612
SOLICITATION NOTICE

J -- J--HAULOUT OF THE R/V KIYI

Notice Date
6/23/2025 12:57:28 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
OFC OF ACQUISITION GRANTS-DENVER DENVER CO 80225 USA
 
ZIP Code
80225
 
Solicitation Number
140G0225R0017
 
Response Due
7/11/2025 2:00:00 PM
 
Archive Date
07/26/2025
 
Point of Contact
Wilson, Mary, Phone: 573-397-2277, Fax: 573-876-1896
 
E-Mail Address
bwilson@usgs.gov
(bwilson@usgs.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment 0002 is being issued to provide answers to questions received. 1. Can you provide all reference drawings called out in the specification? Reference Attachments 1 through 15 2. What bid item should the costs for 3.2, 3.4, and 3.5 be put on? Previous shipyard periods include costs for 3.2, 3.4, and 3.5 in item 4.1. 3. What is to be quoted for bid item 5? Pressure washing of the hull is called out in Item 4.1 and visual inspection of the hull is called out in Work Item 6.2. Bid item 5 may be removed as it is cover by 4.1 and 6.2 as noted. 4. How would you like Work Item 6.2 quoted? Spec states that the antifouling shall be applied over the existing coating and that any areas of failed coating will need to be cleaned, primed, and top-coated. We will not know how much paint has failed until the vessel is out of the water so unsure how to quote that part. Work Item 6.2 should be quoted just for the antifouling renewal. Any repair beyond this will be addressed through a Condition Found Report and a change order. 5. Work Item 6.3. If there any repairs or modifications called out during the ABS survey would they be considered change orders? If there are repairs called for beyond the work required in Item 6.3, they will be addressed through a Condition Found Report and change order. 6. Can you provide quantities of fluids to be removed, disposed of, or replaced for all tanks listed in Work Item 6.5? Estimated Tank Levels. Fuel: 4000 gals, Hydraulic Oil: 900 gals, Lube Oil: 200 gals, Dirty Oil: Empty, Dirty Bilge: Empty. All water tanks will be emptied upon arrival. 7. Work Item 8.1. How many anchor chains are there? And what is the size and length of each chain? There is one anchor chain. Anchor chain is ten shots (900 ft) of � inch die-lock chain. 8. Work Item 8.3. Can you provide the number of square feet of failed coatings? An estimated amount of 500 square feet. 9. Work Item 8.4. Can you provide the make, model, and serial numbers of the generators? Cummins 6BT5.9G2 (M). Cummins B5.9 S/N 45700505 and 45680208
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9b5dca60b45d4932939b6a3ca158ccf9/view)
 
Record
SN07485073-F 20250625/250623230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.