Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 04, 2025 SAM #8621
SOLICITATION NOTICE

Z -- Fort Pierce Beach Renourishment

Notice Date
7/2/2025 7:25:57 PM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W074 ENDIST JACKSNVLLE JACKSONVILLE FL 32207-0019 USA
 
ZIP Code
32207-0019
 
Solicitation Number
W912EP25BA017
 
Response Due
8/19/2025 10:00:00 AM
 
Archive Date
09/03/2025
 
Point of Contact
Meredith Coad, Phone: 9042323724, Ruth Rodriguez, Phone: 9042324534
 
E-Mail Address
meredith.c.coad@usace.army.mil, ruth.c.rodriguez@usace.army.mil
(meredith.c.coad@usace.army.mil, ruth.c.rodriguez@usace.army.mil)
 
Small Business Set-Aside
NONE No Set aside used
 
Description
Pre-Bid Conference will be held virtually on Thursday, July 30, 2025, at 10:00 AM, EDT. Please utilize the link and call information provided below to join the TEAMS Meeting: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING MEETING ID: 993 192 956 204 / PASSCODE: EA3Em3a5 DIAL IN BY PHONE: +1 503-207-9433 / PHONE CONFERENCE ID: 339 001 328# Project work includes construction of a beach berm along approximately 7,000 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-41. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring. The project work is subdivided into a base and one option as indicated on the drawings. The Invitation for Bid (IFB) will be issued on or about 18 July 2025 and bids will be due on or about 19 August 2025. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million The Magnitude of construction is between $10,000,000.00 and $25,000,000.00. The period of performance associated with this requirement is: complete the entire work ready for use not later than 15 May 2026 for Area B and be off the beach, 30 May 2026 for Area A and be off the beach, and 30 June 2026 for the entire contract work. The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS PROCUREMENT IS AN UNRESTRICTED REQUIREMENT. NOTE: U.S. COAST GUARD CERTIFIED DREDGE EQUIPMENT IS REQUIRED TO COMPLETE THE WORK.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c907093c756d46f8b6f81423a3b47bdf/view)
 
Place of Performance
Address: Fort Pierce, FL 34950, USA
Zip Code: 34950
Country: USA
 
Record
SN07497234-F 20250704/250702230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.