Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 02, 2025 SAM #8650
SOLICITATION NOTICE

Y -- EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA

Notice Date
7/31/2025 3:11:54 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W2SN ENDIST ALASKA ANCHORAGE AK 99506-0898 USA
 
ZIP Code
99506-0898
 
Solicitation Number
W911KB25RA010
 
Response Due
5/2/2025 1:00:00 PM
 
Archive Date
04/24/2026
 
Point of Contact
Mark Corn, Phone: 9077532817, THERESA AFRANK, Phone: 9077532739
 
E-Mail Address
mark.r.corn@usace.army.mil, THERESA.M.AFRANK@USACE.ARMY.MIL
(mark.r.corn@usace.army.mil, THERESA.M.AFRANK@USACE.ARMY.MIL)
 
Small Business Set-Aside
8A 8a Competed
 
Awardee
null
 
Description
*********************************************************************** THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS: BRISTOL BUILDING CONSTRUCTORS, LLC RED POINT CONSTRUCTION, LLC STG PACIFIC, LLC *********************************************************************** This is a Design Build project to design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced. The signage for the generators and bulk fuel storage tanks must be replaced. Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator. 30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2b73af669fc8449b88ffbe6cbf503024/view)
 
Place of Performance
Address: POWER PLANT B6203, EIELSON AIR FORCE BASE, ALASKA 99702
Zip Code: 99702
 
Record
SN07531830-F 20250802/250801000106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.