SOURCES SOUGHT
15 -- Super Duper Kits
- Notice Date
- 8/6/2025 6:28:09 AM
- Notice Type
- Sources Sought
- NAICS
- 336411
— Aircraft Manufacturing
- Contracting Office
- FA8509 AFLCMC WIUKA ROBINS AFB GA 31098-1670 USA
- ZIP Code
- 31098-1670
- Solicitation Number
- FD20602530810
- Response Due
- 9/5/2025 2:00:00 PM
- Archive Date
- 09/20/2025
- Point of Contact
- Morgan Bloodworth Tapia, Ashley Blann, Contract Specialist
- E-Mail Address
-
morgan.tapia@us.af.mil, carolyn.blann@us.af.mil
(morgan.tapia@us.af.mil, carolyn.blann@us.af.mil)
- Description
- The purpose of this requirement is to satisfy rapid acquisition of the procurement, assembly and delivery of nine (9) Special Mission System (SMS) Kits, nine (9) Electronic Warfare Bus Kits, nine (9) Auxiliary Flight Deck Station (AFDS) Kits, nine (9) Shielded Wire Kits, and nine (9) Special Mission Processor (SMP) Power Transition Kits. The contractor shall also secure/provide storage for previously procured kit components. The contractor shall inspect for serviceability and compliance with data of any items from the previous kits they utilize in kits procured under this requirement. The contractor will utilize the Basic year to inventory and inspect all provided previously procured components. These components will be fed into the production of the Option 1 kits. Pricing for the option 1 kits will only be determined after the inventory and will only cover items the contractor has to procure. The Contractor will build to print the additional production kits for this order in accordance with the schedule. The kits will be assembled and packed according to Government Furnished Information (GFI) and delivered to a designated location for installation on aircraft. This is a (build to print) effort for the MC-130J Capability Release II Modification Line. Parts the contractor provides will only be Original Equipment Manufacturer (OEM) parts with a Certificate of Conformity and all parts must be new. No contractor furnished repaired, refurbished, reclaimed or reused parts are authorized for this kit build. The contractor will be available to travel to installation site to provide engineering support if needed. In Accordance With (IAW): (1) SMS Time Compliance Technical Order (TCTO) 1C-130(A, H, M)J-516, SMS Kit Part Number P/N 3364972-9, NSN 1680K0102481ALG Items provided to install line and not required in the build/purchase: 1. Ethernet Switches, NSN NSL, PN 42740500 2. Network File Servers, NSN NSL, PN 698282-7 3. Network File Server Mount, NSN NSL, PN PN 698282-3 4. Flash Storage Module, NSN NSL, PN 698282-9 5. Keyboard/Track ball NSN 6625-01-619-1366, PN ARK200-LMM01 6. Special Mission Processor, NSN NSL, PN 315A450-5/-7/-9 7. Special Mission Processor Mount Kit, NSN NSL, PN 698283-3 Items called out as GFE in the TCTO that will be required in this kit build: 1. VDT Adapter Plate, NSN NSL, PN 201524578-10 (2) E. W. Bus TCTO 1C-130(A, H, M)J-586D, E. W. Bus kit Part AFE0010000-101, NSN 1560K0104530A (3) AFDS TCTO 1C-130(A, H, M)J-621C, AFDS kit part number 3369123-2, NSN 1560K0105261BLG Items provided to install line and not required in the build/purchase: 1. Keyboard Trackball, NSN 6625-01-619-1366, PN ARK200-LMM01 (4) Shielded Wire TCTO 1C-130(A, H, M)J-755, Shielded Wire kit NSN 1560K0108583ASO (5) Special Mission Processor (SMP) Power Transition TCTO 1C-130(A, H, M)J-708, kit part number 3370121-1, NSN 1560K0106856ASO
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/10bd5a999a7c41d684051d24dc2d8b63/view)
- Place of Performance
- Address: USA
- Country: USA
- Country: USA
- Record
- SN07539812-F 20250808/250806230057 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |