Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 09, 2025 SAM #8657
MODIFICATION

36 -- 762_Manufacturing Machinery_VA CMOP Tucson_36C77025Q0212 Production Floor Upgrade VA CMOP Tucson

Notice Date
8/7/2025 12:38:43 PM
 
Notice Type
Solicitation
 
NAICS
332999 — All Other Miscellaneous Fabricated Metal Product Manufacturing
 
Contracting Office
NATIONAL CMOP OFFICE (36C770) LEAVENWORTH KS 66048 USA
 
ZIP Code
66048
 
Solicitation Number
36C77025Q0212
 
Response Due
9/9/2025 7:00:00 AM
 
Archive Date
11/08/2025
 
Point of Contact
Michael W McAlhaney, Contracting Specialist
 
E-Mail Address
Michael.McAlhaney@va.gov
(Michael.McAlhaney@va.gov)
 
Awardee
null
 
Description
Procurement is to replace the existing Tablet and Capsule Automation (IPD area) and ancillary support systems at the Dallas CMOP with new, proven pharmacy automation (TCA) that is faster, safer, and more reliable. Hardware shall include, but is not limited to, pucks, puck conveyance, labelers, weight scale, automatic dispensers, canisters, post weight scales, high resolution camera, exception station, workstations, pharmacy verification stations, cappers, sealers, and associated tote conveyors. Tote line upgrades are needed to increase tote capacity and reduce choke points which will increase throughput throughout the system. The new Tablet Capsule Automation aka TCA, plus Tote line upgrade equipment must be fully integrated with the existing Pharmacy Operating System (POS) and Tote Conveyor and production system, with no single point of failure that meets the accuracy, timeliness, and throughput requirements of the dynamic workload of the Dallas CMOP. The Dallas CMOP requires a contractor to serve as a systems integrator who will design, build, and integrate a working TCA area, and upgrade tote line equipment, with the current VA CMOP National data infrastructure and POS. Any system, subsystem, or component shall be fully functional and fully integrated with the CMOP electronic data structure and the Pharmacy Operating System (POS). The TCA equipment shall be capable of dispensing individual solid dosage forms. Ancillary support systems, comprehensive data logging, collection and reporting system are required. Responses shall demonstrate a complete understanding of the need and how the contractor plans to meet the SOR requirements.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d88f68ecb6dd48899ef70ac5cc04acb1/view)
 
Record
SN07540330-F 20250809/250807230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.