Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 10, 2025 SAM #8658
SOLICITATION NOTICE

Y -- USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

Notice Date
8/8/2025 5:55:41 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
FPAC BUS CNTR-ACQ DIV WASHINGTON DC 20250 USA
 
ZIP Code
20250
 
Solicitation Number
12FPC325B0006
 
Response Due
8/26/2025 10:00:00 AM
 
Archive Date
09/10/2025
 
Point of Contact
Mark Domingo
 
E-Mail Address
mark.domingo@usda.gov
(mark.domingo@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Please see attachment combined synoposis solicitation and Statement of Works (SOW) for further detials. This solicitation is a Total Small Business Set-Aside. A firm fixed price construction contract is anticipated to be awarded under Sealed Bidding in FAR Part 14. Site Visit is scheduled for 8/13/2025 at 10:00AM meeting at: 525 S. Loop 288 Suite C-1 Denton, TX 76205 A bid guarantee shall be 20% of the bid price or $3 Million, whichever is less. The estimated magnitude of the project is between $1,250,000 and $1,750,000 *Site work will be completed one at a time, finish one site requried work then will move on to the other site to begin work. The upstream wave berm repair of Site 11 will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and reconstructing the fence above the rock riprap. The upstream wave berm repair of Site 14 will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and reconstructing the fence above the rock riprap. The existing, constructed plunge basin has experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basin will be armored with a 2 feet thick blanket of rock riprap.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a5bd256c7ce54f95be40765fcdfcfc55/view)
 
Place of Performance
Address: Denton, GA, USA
Country: USA
 
Record
SN07543517-F 20250810/250808230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.