Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 16, 2025 SAM #8664
SPECIAL NOTICE

Y -- Notice of Intent Additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland

Notice Date
8/14/2025 12:02:25 PM
 
Notice Type
Special Notice
 
NAICS
237 —
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS25S0063
 
Response Due
8/28/2025 1:00:00 PM
 
Archive Date
09/12/2025
 
Point of Contact
Mohenda R. Surage, Phone: 9179408013, Brian Packowski
 
E-Mail Address
mohenda.r.surage@usace.army.mil, Brian.J.Packowski@usace.army.mil
(mohenda.r.surage@usace.army.mil, Brian.J.Packowski@usace.army.mil)
 
Description
Notice of Intent additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland The New York District, U.S. Army Corps of Engineers intends to award a sole source modification to Per Aarsleff Gr�nland ApS for additional shoreline stabilization and road/shoreline repairs at Pituffik Space Base, Greenland, under the existing Shoreline Stabilization/Landfill Capping contract W912DS24C0033. This is not a formal solicitation or request for proposal. This notice of intent is to give notice of the Government's intent to make a sole source award under the authority cited in Federal Acquisition Regulation 6.302-1- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The general requirement is for the contractor to design and repair the area of causeway/shoreline with new gravel cover layers (Riprap) on the south side of the causeway, approximately 500 linear feet. This includes adding new cover layers to existing sloped berms and causeway, repairing rock jetty roads with new top layers, and repairing the sloped rock armored breakwater with geotextile layers, underlayer of filter rock, median stone mass M50 = 25-50 kg, and a cover layer of armor rock, median stone mass 2500 kg. The work also includes repairing settled foundations and bracing supports for the electrical and NSC cable trays, and performing repairs to support structures as needed. Any vendor wishing to propose an alternative source must provide a copy of all relevant data demonstrating the alternative source satisfies the above requirements, by the required due date and time, to Mohenda Surage at: Mohenda.r.surage@usace.army.mil This is not a request to respond to a solicitation. Magnitude of Construction is estimated to be between $1,000,000.00 - $5,000,000.00.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/904f776b512f429eaa7f5195dcec9b4e/view)
 
Place of Performance
Address: GRL
Country: GRL
 
Record
SN07550828-F 20250816/250814230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.