Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 21, 2025 SAM #8669
SOLICITATION NOTICE

N -- PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT

Notice Date
8/19/2025 1:20:48 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
6923G2 DOT MARITIME ADMINISTRATION KINGS POINT NY 11024 USA
 
ZIP Code
11024
 
Solicitation Number
6923G225Q000014
 
Response Due
8/27/2025 6:00:00 AM
 
Archive Date
09/11/2025
 
Point of Contact
CARMEN I. FELIZ, Phone: 5167266149, Fax: 5167735131, Amit S. Narine, Phone: 5167266032
 
E-Mail Address
FELIZC@USMMA.EDU, NarineA@usmma.edu
(FELIZC@USMMA.EDU, NarineA@usmma.edu)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
BACKGROUND The United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration (MARAD) managed by the United States Department of Transportation. The USMMA is listed on the National Register of Historic Places. Therefore, all work shall be consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties (36 CFR part 68) http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf. All work shall meet or exceed the standards provided in the Secretary of the Interior�s Standards for Rehabilitation and guidelines for applying the standards published by the National Park Service, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation. SCOPE The USMMA seeks a qualified and experienced contractor to provide labor, material, transportation, tools, equipment and supervision to perform a replacement of the steam condensate return tank and pumps inside of the mechanical room of Palmer Hall. The contractor will also replace the existing sump pump with a new two pump system and cover. STATEMENT OF WORK 3 DELIVERABLES The Contractor is responsible for the following; Condensate return tank 1. Disconnect prewired unit control panel from duplex condensate tank. 2. Disconnect steam supply and condensate return lines from condensate tank. 3. Remove and replace duplex condensate return tank with contractor supplied new unit. 4. Replace all steam traps on condensate tank. 5. Replace all isolation valves for condensate tank. 6. Remove old discharge check valves and replace. 7. Reconnect and energize prewired unit control panel supplied with new condensate return tank. 8. All fittings, pumps, steam traps, and valves to be supplied as new from contractor. 9. Replacement of any pipe insulation and pipe hangers which require removal to complete any repairs. All insulation shall be replaced with fiberglass pipe wrap or approved equal. 10. Leak checking and ensuring all installed piping and fittings are free from leaks. Sump Pump 11. Remove drain piping to access sump pit cover and pump. 12. Remove existing pump and cover 13. Install new sump pump with a two-pump system that can handle high temperatures. 14. Install new cover that works with new system. 15. Reconnect to all existing branches. 16. All fittings, pumps, steam traps, and valves to be supplied as new. 17. Leak test. Please see attached pictures STATEMENT OF WORK 5 1. The contractor shall provide all labor and material, transportation and supervision in the performance of all tasks detailed in this statement of work. 2. All work is to conform to federal, state and local regulations and codes. 3. Maintain a work area compliant with safety standards. 4. Areas worked on shall be cleaned and secured on a daily basis. 5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the contractor at no cost to the Government. 6. Examine existing conditions prior to any repair activities, site visit will be scheduled to inspect the site where services are to be performed. 7. Excess material and debris shall be disposed of in accordance with local and state ordinances. 8. No vehicles shall be driven on the sidewalks or grass. 9. Make every effort to minimize the impact to the daily routine of the Academy. CLOSE OUT: The contractor shall provide a signed warranty of any damage, defective material and improper workmanship on any material provided in this contract. Materials and labor to be warranted for one year after installation, and equipment to be warranted per manufacturer SUBMITTALS 1. N/A GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR INFORMATION. N/A CONSIDERATIONS STATEMENT OF WORK 6 � Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or problems that arise). � Inform COR of any anticipated disruption in services for construction at least three (3) days in advance PLACE OF PERFORMANCE Contractor will perform the task at located at the USMMA, 300 Steamboat Road, Kings Point, N.Y. 11024 PERIOD OF PERFORMANCE Work is to be completed within 90 calendar days after NTP is approved. Work is to be performed during normal business hours 0700 to 1630, Monday through Friday unless approval is granted by the Contracting Officer. Appplicable wage determination WD# 2015-4157 Rev# 29, dated 7/8/2025 Please see attached SCOPE OF WORK along with pictures
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b034fd5a006849898deaed5c47494377/view)
 
Place of Performance
Address: Kings Point, NY 11024, USA
Zip Code: 11024
Country: USA
 
Record
SN07556689-F 20250821/250819230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.