Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 28, 2025 SAM #8676
SOLICITATION NOTICE

61 -- Diesel Powered Portable Skid Mounted Enclosed Generators and Maintenance

Notice Date
8/26/2025 7:15:11 AM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
STRATEGIC WEAPONS FAC PAC FINANCIAL SILVERDALE WA 98315-6499 USA
 
ZIP Code
98315-6499
 
Solicitation Number
N0040625QS563
 
Response Due
9/3/2025 5:00:00 PM
 
Archive Date
09/18/2025
 
Point of Contact
Tabbatha Austin, Phone: 3605643069, Denise Manor
 
E-Mail Address
tabbatha.austin@swfpac.navy.mil, denise.e.manor.civ@us.navy.mil
(tabbatha.austin@swfpac.navy.mil, denise.e.manor.civ@us.navy.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Diesel Powered Portable Skid Mounted Enclosed Generators Statement of Work Strategic Weapons Facility Pacific (SWFPAC), Code SPB14 Scope of Work: The contractor shall provide, unpack and deliver in-place two (2), enclosed Diesel Powered Portable Skid Mounted Generator-Sets with power cable connections to United States Coast Guard Airstation/SFO Port Angeles, 1 Ediz Hook Road, Port Angeles, WA 98362. Prior to delivery contractor shall remove and dispose of (2) currently installed 50kW generators. Contractor shall coordinate delivery, installation, connection and operational testing of (2) new generators with Government Point of Contact (POC). Contractor shall submit detailed specifications and recommended origninal equipment manufacturer (OEM) maintenance for proposed generators. Contractor shall provide 12 months of OEM recommended maintenance following installation and successful testing, to be performed on-site. Maintenance may be extended up to 1 time for an additional 12-month period. Period of Performance: Once awarded, contractor will provide equipment specified by this contract within 6 (six) months from award date. Deliverables: Diesel Generator #1 Rating shall be 50 kW, three phase, four-wire, 480 VAC line voltage, 277 VAC phase voltage, with a continuous power factor of 0.8. The load under normal conditions is approximately 18 kW. A single 7.5 horsepower three-phase sewage lift pump motor will be called upon intermittently as an addition to this normal load. Contractor may recommend a diesel-generator rating lower than the recommended 50 kW @ PF=0.8 is viable to avoid unnecessary 'wet-stacking' of the diesel during times when the lift pump is not operating, i.e., 18 kW. Contractor shall provide connection cable compatible with transfer switch in Enclosure (1). Diesel-generator shall be able to start sewage lift pump motor directly across the line without causing an unacceptable voltage drop to the system. The specific technical cut sheets for the sewage lift pump motor are attached as Enclosure (2). Diesel-generator shall have the capability to auto-start via an automatic transfer bus/switch for future capability. Diesel Generator #2 Rating shall be 50 kW, three phase, four-wire, 480 VAC line voltage, 277 VAC phase voltage, with a continuous power factor of 0.8. The load under normal conditions is approximately 18 kW. A single 7.5 horsepower three-phase sewage lift pump motor will be called upon intermittently as an addition to this normal load. Contractor may recommend a diesel-generator rating lower than the recommended 50 kW @ PF=0.8 is viable to avoid unnecessary 'wet-stacking' of the diesel during times when the lift pump is not operating, i.e., 18 kW. Contractor shall provide connection cable compatible with transfer switch in Enclosure (1). Diesel-generator shall be able to start sewage lift pump motors directly across the line simultaneously without causing an unacceptable voltage drop to the system. The specific technical cut sheets for the sewage lift pump motors are attached as Enclosure (3). Diesel-generator shall have the capability to auto-start via an automatic transfer bus/switch for future capability. Power Cable Connections Provide 2 power cables, one for each generator. Power cables shall be of an appropriate rating such that they can handle the full capacity of the generators. Cables shall be compatible with the transfer switch connection specified in Enclosure (1). Cables shall be at least 20 feet in length. Equipment provided shall meet or exceed the following requirements: Generator shall be an all season operating system, portable diesel-generator set designed and constructed for outdoor use in the Pacific Northwest region, situated in an environment adjacent to salt-water and unshielded from all potential types of weather including windblown rain and snow. Enclosure to have drainage. Generator shall have a fully lockable enclosure to allow safe unattended operation. All aspects of their diesel-generator set including the excitation equipment, voltage regulator, and governor will perform properly under the following transient loading conditions: Assume that the diesel-generator set is supplying a steady-state load of 35 kW (44 kVA @ P.F. = 0.8) at which time the sewage lift pump induction motor (480 VAC, three-phase, 7.5 horsepower) starts directly across the line at full voltage, i.e., without soft-starting equipment. The generator shall be capable of running for an indefinite period of time with the 'normal' phase imbalance of Phase A=9.26 kW, Phase B=7.24 kW, Phase C=1.59 kW in addition to the lift pump motor in Enclosure (1) running and will not cause damaging negative sequence heating beyond the generator thermal capabilities. Generator shall have a tank capacity to support at least 12 hours of continuous, full rate operation before refueling is required. Maintenance Description Maintenance shall include but it not limited to the following maintenance actions: Monthly operational check of at least 30 min (per OEM guidance) Monthly fluid level check and top off as necessary (per OEM guidance), to include: Fuel Oil Coolant Diesel Exhaust Fluid (if equipped) Once Annual Oil Change Contractor shall be responsible for providing all consumables and proper disposal of all waste. Disposal Contractor shall dispose of currently installed generators in accordance with all applicable federal and state regulation. Install Contractor will deliver generators to the site locations at the specified address. Contractor will place and secure the generator to the designated concrete pads. Contractor will make all required electrical connections for operation. Contractor will fill fuel and check all required fluids and fill to the OEMS specification. Operational Test Contractor will coordinate with the Government POC to conduct operational load test of newly install generators. Contractor will provide initial operator training and (3) operation manuals. Contractor will run and oversee initial operation of generators during operational test.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8583501fbd9942c6bc0239a2828edb42/view)
 
Place of Performance
Address: Silverdale, WA 98315, USA
Zip Code: 98315
Country: USA
 
Record
SN07567417-F 20250828/250826230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.