SOLICITATION NOTICE
J -- USS BLUE RIDGE (LCC-19) 5C1 DSRA TYCOM 1
- Notice Date
- 8/28/2025 12:42:54 AM
- Notice Type
- Solicitation
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- NAVSUP FLT LOG CTR YOKOSUKA FPO AP 96349-1500 USA
- ZIP Code
- 96349-1500
- Solicitation Number
- N6264925RA021
- Response Due
- 9/28/2025 6:00:00 PM
- Archive Date
- 10/14/2025
- Point of Contact
- Miwa Takahashi, Phone: 81468167623, Ai Gillard - Contracting Officer, Phone: 01181468163805, Fax: 0468257298
- E-Mail Address
-
miwa.takahashi2.ln@us.navy.mil, ai.gillard.ln@us.navy.mil
(miwa.takahashi2.ln@us.navy.mil, ai.gillard.ln@us.navy.mil)
- Description
- The requirement is for ship repair, maintenance and overhaul of United States (US) Navy surface ship USS BLUE RIDGE (LCC-19), Docking-Selected Restricted Availability (DSRA), in support of US Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). The work is composed of 47 Task Group Instructions (TGIs) of various ship repair overhaul, preservation, and replacement work onboard the ship. The work also includes a Government requirement to establish the capability to support testing, quality assurance, technical documents and other requirements as necessary to accomplish the specified requirements. It places an administratively technical requirement on the contractor to provide a schedule and staffing plan for the identification and assignment of all contracted workers, as well as the coordination of the work to be performed by the contractor to ensure proper sequencing of work and the prevention of potential work stoppages or delays. In addition, the contractor is responsible for all labor, subcontractor management, supervision, coordination, quality control, quality assurance, quality management, safety management, environmental management, material, equipment, temporary services, and transportation necessary to perform the requirement. To improve Condition Found Report (CFR) turnaround time, a Growth CLIN will be implemented to accommodate anticipated growth works and will be processed utilizing the Growth Management Request (GMR) Level of Effort (LOE) to Completion. The anticipated contractual Period of Performance (POP) is 21-JUL-2026 to 21-NOV-2027 (Changed from 12-Jan-2026 to 15-May-2027). PLACE OF PERFORMANCE: Commander, Fleet Activities Yokosuka (CFAY) Naval Base OFFER: Offerors must provide all information required by this solicitation no later than 16 June 2025 at 10:00 AM Japan Standard Time (JST). Access to the work specification package listed in Section J as ATTACHMENT (I) may only be accessed through DoD SAFE. DoD SAFE is a secure U.S.Government repository which enables the sharing of large files and requires outside users to receive a drop-off request from the U.S. Government. Therefore, any offeror intending to provide a proposal to this solicitation shall request access by sending an email to the following Point of Contact: Miwa Takahashi (miwa.takahashi2.ln@us.navy.mil) All documents incluiding solicitatiion Attachments, Task Group Instructions (TGIs) and drawings will be available through DoD SAFE. Once the U.S. Government receives the offeror's access request, the U.S. Government will provide the offeror with a link and instructions to retrieve ATTACHMENT (I). When submitting your proposal, you must specify any hazardous material in accordance with FAR 52.223-3 (Hazardous Material ID) and DFARS 252.223-7001. When submitting your proposal, you must specify if you anticipate sea transportation in accordance with DFARS 252.247-7022. If there is a time limit on your offer, you must specify this at submission of your proposal. If there are any amendments to this RFP, please acknowledge them when submitting your proposal in the proposal comment section. On 20 May 2025, Solicitation Amendment N6264925RA0210001 was issued to extend the required response date/time from 16 Jun 2025, 10:00 AM Japan Standard Time (JST) to 15 Jul 2025, 10:00 AM Japan Standard Time (JST). Other terms and condition remain unchanged. See Solicitation Amendment N6264925RA0210001 for further details. On 14 Jul 2025, Solicitation Amendment N6264925RA0210001 was issued to respond to an industry question. All other information remains unchanged. On 28 Aug 2025, Solicitation Amendment 0003 was issued to re-open the Solicitation No. N6264925RA021 since revised TGIs with new POP dates have been issued. The due date/time for submission of proposal for solicitation amendment No. N6264925RA0210003 is 29 Sep 2025/10:00am.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/c665a77ad0e4496bb6d36440420322e8/view)
- Place of Performance
- Address: Yokosuka, JP-14, JPN
- Country: JPN
- Country: JPN
- Record
- SN07570778-F 20250830/250828230047 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |