SOLICITATION NOTICE

Y -- Pave Parking Area at John W. Flannagan Dam and Reservoir

Notice Date
9/3/2025 10:57:43 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
W072 ENDIST PITTSBURGH PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W9123725QA061
 
Response Due
9/17/2025 8:00:00 AM
 
Archive Date
10/10/2025
 
Point of Contact
Aaron Barr, Phone: 412-395-7157, Miriaha Sigmon, Phone: (412) 395-7241
 
E-Mail Address
aaron.m.barr@usace.army.mil, Miriaha.D.Sigmon@usace.army.mil
(aaron.m.barr@usace.army.mil, Miriaha.D.Sigmon@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The contractor shall provide all materials, equipment, labor, layouts of work features, and supervision needed to complete paving.Project construction will generally consist of the following items of work:? The Contractor shall apply a tack coat conforming to VDOT Item 310-1 on all areas to be resurfaced. Tack coat shall be placed at 0.10 gallons per square yard. ? The Contractor shall place a 2 inch surface course of asphalt concrete pavement on all areas, surface course must conform to VDOT Item 315-1. Asphalt will begin at the entrance to the project office from main road and shall continue up thru the Main office parking area, 4000 square yards. All paving will be full depth. The existing parking area has an existing gravel base.? Contractor shall ensure all paving will drain water without any water standing. Contractor shall prepare the site to avoid any low or high spots before paving. ? Paving is 4000 square yards feet of full depth pavement consisting of a 2-base course with a 1 ? top coat surface course which shall conform to the same VDOT specifications required.? The Contractor shall grade, reshape, and compact all areas as needed. In areas with no existing base, the Contractor shall place and compact an additional 2- 4-inch aggregate base in accordance with VDOT Item 309-1. A two-layer asphalt base course shall be installed per VDOT Item 315-1, BM-2. A tack coat, per VDOT Item 310-1 shall be applied at a rate of .10 gallons per square yard. Finally, a 1 inch asphalt surface course shall be placed over all base material, conforming to VDOT Item 315-1, SM-2-A. ? Contractor shall taper asphalt to adjoining roads and parking areas. ? A drawing defining the approximate area is included below. Note, buildings in the drawing are no longer in the area. Drawing is not to scale and used for a reference only. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/da1c96c9163b4d2dbb4d5aa1ae07e8f3/view)
 
Place of Performance
Address: 2204 Flannagan Dam Road, Haysi, VA 24256 24256
Zip Code: 24256
 
Record
SN07576302-F 20250905/250903230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.