Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 06, 2025 SAM #8685
SOLICITATION NOTICE

54 -- Scaffolding Rental and Erection at Kentucky Lock and Dam

Notice Date
9/4/2025 1:34:12 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
532490 — Other Commercial and Industrial Machinery and Equipment Rental and Leasing
 
Contracting Office
W072 ENDIST PITTSBURGH PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W9123725QA062
 
Response Due
9/11/2025 8:00:00 AM
 
Archive Date
09/04/2026
 
Point of Contact
Aaron Barr, Phone: 412-395-7157, Miriaha D. Sigmon, Phone: (412) 395-7241
 
E-Mail Address
aaron.m.barr@usace.army.mil, Miriaha.D.Sigmon@usace.army.mil
(aaron.m.barr@usace.army.mil, Miriaha.D.Sigmon@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The Contractor shall erect 40 feet of stair scaffolding from the bottom of the dewatered lock chamber floor to the top of the temporary dam. The approximate location for this scaffolding will be 10 to 15 feet upstream of the lower miter gates on the land wall side of the chamber. The scaffolding can be anchored to the vertical concrete lock wall from the bottom of the chamber floor to the top of the 40-foot scaffolding. The Contractor shall provide 5 each 1-inch-thick steel plates measuring 5-ft x 10-ft for the scaffolding leg support on the bottom of the lock chamber for stability. This work shall be completed on October 27-28, 2025, after the lock chamber is dewatered. The Contractor shall disassemble the scaffolding between November 17-18, 2025. The Government will supply cranes, crane operators and riggers to move scaffolding components, equipment and personnel from the parking lot to the lock chamber floor during erection and back out of the chamber during disassembly. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f0d02a3e1359421d957011b56c50311e/view)
 
Place of Performance
Address: Kentucky Lock and Dam, 622 Ketucky Dam Road, Grand Rivers, KY 42045 42045
Zip Code: 42045
 
Record
SN07578740-F 20250906/250904230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.