Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 19, 2025 SAM #8698
AWARD

Z -- Cochiti Main Building Insulation Replacement

Notice Date
9/17/2025 3:24:13 PM
 
Notice Type
Award Notice
 
NAICS
238310 — Drywall and Insulation Contractors
 
Contracting Office
W075 ENDIST ALBUQUERQUE ALBUQUERQUE NM 87109-3435 USA
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP25QA019
 
Archive Date
10/02/2025
 
Point of Contact
Loretta Sanchez, Phone: 5053423210, KAREN K IRVING, Phone: 5053423356
 
E-Mail Address
loretta.d.sanchez@usace.army.mil, KAREN.K.IRVING@USACE.ARMY.MIL
(loretta.d.sanchez@usace.army.mil, KAREN.K.IRVING@USACE.ARMY.MIL)
 
Small Business Set-Aside
8AN 8(a) Sole Source
 
Award Number
W912PP25PA032
 
Award Date
09/17/2025
 
Awardee
RYMARC CONSTRUCTION INC Albuquerque NM 87107 USA
 
Award Amount
138121.62
 
Description
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The work will consist of removing the existing insulation on the ceiling (approximately 2,450 sq ft) and exterior walls (approximately 900 sq ft) of the main maintenance bay and welding bay, and the exterior walls only in the west bay of the Maintenance Building (approximately 1,150 sq ft) and replacing it with vinyl-faced fiberglass blanket insulation rated at least R-13. Prior to removal of the existing ceiling insulation in the main maintenance bay the Contractor will completely remove the existing lighting fixtures, the suspended ceiling and the abandoned ductwork above it, being careful to not damage existing cabling, fire and security alarm devices and wiring in the process. The Contractor will also provide the means for, and execute the disposal of, all existing suspended ceiling and insulation materials removed as part of this Statement of Work. The Contractor will ensure that that any exposed voids through the roof and exterior walls are properly sealed prior to installing any new insulation materials. Following the installation of the new insulation materials, the Contractor will install six new linear LED high-bay 12,000-lumen lighting fixtures directly into the existing junction boxes mounted on the ceiling of the main maintenance bay. If needed, the Contractor will replace these junction boxes if they don�t meet current electrical code or are otherwise unsafe or obsolete. The Contractor will also reattach or reinstall all fire and security alarm system devices to the main ceiling in the closest vicinity to their original locations and properly tether (using hook-and-loop strips) all existing wiring for those devices. All work will be performed in accordance with all State and Federal regulations and applicable building codes. The Contractor will furnish copies of any and all manufacturer�s operation and maintenance manuals associated with this equipment. The intent of this contract is to eliminate the personnel hazards of excess condensation caused by the failed existing insulation. Replacing this insulation will also significantly increase the sustainability of the Cochiti Dam and Reservoir Maintenance Building. All work is to be done according to industry standard practices, within all Federal and State regulations and current building codes, utilizing current safety practices, skills and materials appropriate to this type of work.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/3720226aa64e47a3bf4bb104a26fc36c/view)
 
Place of Performance
Address: Pena Blanca, NM 87041, USA
Zip Code: 87041
Country: USA
 
Record
SN07593588-F 20250919/250917230035 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.