Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 05, 2025 SAM #8745
MODIFICATION

Y -- CO OMAD 300(70) MINUTEMAN MISSILE ACCESS ROAD

Notice Date
11/3/2025 10:15:07 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF25B000008
 
Response Due
12/9/2025 1:00:00 PM
 
Archive Date
01/29/2026
 
Point of Contact
Douglas Whitcomb, Leslie Karsten
 
E-Mail Address
CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
PROJECT NUMBER: CO OMAD 300(70) PROJECT NAME: Minuteman Missile Access Road PROJECT DESCRIPTION: CO OMAD 300(70) - The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling of up to 156.582 miles of existing gravel Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force. With a fixed-price variable-scope contracting method, less mileage may be awarded. The total amount of miles included in the scope will be dictated by the mileage proposed. The project PS&E will provide a prioritized schedule of roadways to be improved that is anticipated to include up to 156.582 total miles of roadway reconditioning and re-graveling of existing aggregate surface roads. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/43ed7c2201de471694f96b5592c372bb/view)
 
Place of Performance
Address: CO, USA
Country: USA
 
Record
SN07633433-F 20251105/251103230037 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.