Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 05, 2025 SAM #8745
SOURCES SOUGHT

F -- Sources Sought Notice Spill Prevention Control and Countermeasures Plan (SPCCP) 5-year review Marion, IL VA Medical Center

Notice Date
11/3/2025 11:44:31 AM
 
Notice Type
Sources Sought
 
NAICS
541330 — Engineering Services
 
Contracting Office
255-NETWORK CONTRACT OFFICE 15 (36C255) LEAVENWORTH KS 66048 USA
 
ZIP Code
66048
 
Solicitation Number
36C25526Q0066
 
Response Due
11/7/2025 9:00:00 AM
 
Archive Date
12/07/2025
 
Point of Contact
Greg McMillan Sr., Contracting Officer, Phone: 913-758-9919
 
E-Mail Address
Gregory.McMillan@va.gov
(Gregory.McMillan@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business Set Aside
 
Awardee
null
 
Description
Revise Spill Prevention, Control, and Countermeasures Plan (SPCCP) For Marion, IL VA Medical Center (MRN) INTRODUCTION MRN VAMC is seeking a 5-year review and amendment of the current plan to verify compliance with current and any new requirements listed in (a-d) below and to update since the approval of the current SPCCP dated/signed March 30, 2021. The revised document shall be electronic and user-friendly. The contractor shall perform a 5-year review according to 40 CFR 112, to include any revisions, updates, or technical changes for amendment. The contractor will make necessary changes including plan content, maps, worksheets, charts, cross references, etc. The contractor may use current plans as references for technical information. SPECIFIC PROJECT REQUIREMENTS The contractor shall: amend, update, and prepare the existing SPCCP, which must be fully compliant with the latest requirements of 40 CFR 112 as well as applicable State and Local regulations. An update of the emergency response plan should be included for accidental releases of vehicular and equipment petroleum products, coolants, and lubricants within the SPCCP. This will include coordination with and cross-referencing the medical center s current Emergency Operations Plan and Integrated Contingency Plan. The plan shall be certified by an Illinois registered Professional Engineer (P.E.) experienced in SPCCP preparation and current industry standards for oil storage and spill prevention. 40CFR 112.7, Oil Pollution Prevention. Amend technical changes from design, construction, operation, and/or maintenance. National Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code. All applicable federal, state and local regulations. Provide updates for any new Reporting and Training requirements
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/14e7a0a5e1cd4bf2811ff8471c913811/view)
 
Place of Performance
Address: Department of Veterans Affairs Marion VA Medical Center 2401 West Main St., Marion, IL 62959, USA
Zip Code: 62959
Country: USA
 
Record
SN07634045-F 20251105/251103230041 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.