Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 07, 2025 SAM #8747
SOLICITATION NOTICE

99 -- Fabrication of parts

Notice Date
11/5/2025 10:53:38 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
332710 — Machine Shops
 
Contracting Office
NAVAL RESEARCH LABORATORY WASHINGTON DC 20375-5328 USA
 
ZIP Code
20375-5328
 
Solicitation Number
N0017326RGF01
 
Response Due
11/21/2025 8:30:00 AM
 
Archive Date
12/06/2025
 
Point of Contact
Graham W.J. Fisher, Phone: 2029231344, Ryan Wheelock, Phone: 2029231481
 
E-Mail Address
graham.w.fisher.civ@us.navy.mil, RYAN.A.WHEELOCK.CIV@US.NAVY.MIL
(graham.w.fisher.civ@us.navy.mil, RYAN.A.WHEELOCK.CIV@US.NAVY.MIL)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
NRL requires fabrication of custom designed parts. The specifications for each part are attached, as well as a chart detailing the materials and quantities required. Please review the attachments for more information. Please alert the POC if there are any issues accessing the STEP files. In response to questions received by vendors NRL provides the following clarifications: CLIN structure can be up to the vendor (ie single line item versus per unit breakdown) Delivery is to be FOB Destination Delivery is to Key West FL, the actual machining can take place anywhere within the United States Quality documentation will be required Evaluation will be Best Value (see below for more information) There is no minimum CMMC level required NRL has made a minor revision to the Item Description, please see the document labelled ""Quantities REVISED"" There was a question about tolerance ranges. The answer: +.010 / -.005 on holes, .020 true position on holes .030 overall profile tolerance for features other than holes For NGCE-RAM-20250514-1, NGCE-RAM-20250513-1, and NGCE-RAM-20250526-1 the ""CLear Anodize"" requirement is further clarified to mean MIL-A-8625 Type II, Class 1 Clear Anodize representing .0002-.0005 thickness FAR SECTION V: FAR 52.212-2 - EVALUATION - COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) applies to this acquisition. (a) The Government will award a contract resulting from this solicitation to the responsible vendor whose offer conforming to the solicitation will be most advantageous to the Government. Factors others than price shall be considered, and a Price/Technical Tradeoff analysis of both price and non-price factors will be conducted in evaluating each quote submitted. Trade-off considerations may result in the determination that it is in the best interest of the Government to award to other than the lowest priced Vendor or other than the highest technically rated Vendor. The following factors shall be used to evaluate offers: 1. TECHNICAL CAPABILITY: The Government will evaluate quotes based on how well the proposed product(s)s meet the requirement of the Specifications Attachment (""Quantities REVISED.pdf"" and STEP files) For the purpose of evaluation, Technical Acceptability is defined as meeting all physical, functional, performance, and any other terms and conditions specified in the solicitation and its attachment(s). General statements, that the offeror can or will comply with the requirements, that standard procedures will be used, that well known techniques will be used, or that paraphrases the RFP's specifications in whole or in part, will not constitute compliance with the mandatory requirements concerning the content of the technical proposal. The following table of technical requirements define specific value to the Government. Each requirement will be assessed an adjectival rating of Superior, Acceptable or Unacceptable, based on whether the information submitted both meets and exceeds specifications, meets specifications, or does not meet specifications. Superior S The proposal contains no deficiencies or weaknesses. Based on information provided, the offeror demonstrates an understanding of the specifications required and MEETS all specifications AND EXCEEDS some specifications. Acceptable A The proposal contains no deficiencies or weaknesses. Based on information provided, the offeror demonstrates an understanding of the specifications required and MEETS all specifications. Unacceptable U The proposal contains deficiencies, weaknesses, or omissions. Proposal fails to provide a reasonable, logical approach to fulfilling the government's requirements. Based on information provided, the proposal DOES NOT MEET all specifications. 2. DELIVERY SCHEDULE The Government will evaluate quotes based on the delivery schedule proposed by vendors. NRL anticipates delivery NLT 10 weeks after receipt of order. The following table of technical requirements define specific value to the Government. Each requirement will be assessed an adjectival rating of Superior, Acceptable or Unacceptable, based on whether the information submitted both meets and exceeds specifications, meets specifications, or does not meet specifications. Superior S The proposal contains no deficiencies or weaknesses. Based on information provided, the offeror demonstrates an understanding of the specifications required and MEETS all specifications AND EXCEEDS some specifications. Acceptable A The proposal contains no deficiencies or weaknesses. Based on information provided, the offeror demonstrates an understanding of the specifications required and MEETS all specifications. Unacceptable U The proposal contains deficiencies, weaknesses, or omissions. Proposal fails to provide a reasonable, logical approach to fulfilling the government's requirements. Based on information provided, the proposal DOES NOT MEET all specifications. 3. PAST PERFORMANCE: IAW DFARS 252.213-7000, the contracting officer shall consider data available in the statistical reporting module of the Supplier Performance Risk System (SPRS) regarding the supplier�s past performance history for the PSC and/or NAICS of the supplies being purchased. Ratings: Acceptable (Low Risk): SPRS Supplier Risk Score of Blue, Purple, or Green, indicating a higher score in SPRS and are therefore, considered to have a lower risk of poor contract performance Not Acceptable (High Risk): SPRS Supplier Risk Score of Yellow or Red, indicating a lower score in SPRS and are therefore, considered to have a higher risk of poor contract performance Neutral: In the case of a supplier without a record of relevant past performance history in SPRS for the NAICS or PSC of the supplies being purchased, the supplier may not be evaluated favorably or unfavorably for its past performance history. 4. PRICE REASONABLENESS: The Government anticipates making a determination of fair and reasonable price based on competitive quotes. If only one response is received, the Government may use other methods as described at 13.106-3(a)(2). (b) Award on Initial Responses; Exchanges with Best-Suited Contractor The Government anticipates selecting the best-suited contractor from initial responses, without engaging in exchanges with vendors. Vendors are strongly encouraged to submit their best technical solutions and price in response to this RFQ. However, the Government may engage in limited exchanges to clarify certain aspects of quotes. Once the Government determines the contractor that is the best-suited (i.e., the apparent successful contractor), the Government reserves the right to communicate with only that contractor to address any remaining issues and revise quotes, if necessary, and finalize an award with that contractor. These issues may include technical and price. If the parties cannot successfully address any remaining issues, as determined in the sole discretion of the Government, the Government reserves the right to conduct exchanges with the next best-suited contractor and address any remaining issues and revise quotes, if necessary, and finalize an award with that contractor. (c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror, within the time for acceptance specified in the offer, shall result in a binding contract, without further action by either party. Before the offer�s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. (End of provision)
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/474338c92c4b427f92f3aada5eb786a9/view)
 
Place of Performance
Address: FL 33040, USA
Zip Code: 33040
Country: USA
 
Record
SN07636286-F 20251107/251105230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.