Y -- 528A6-25-614 Replace Sidewalks Station Wide

Notice Date
11/6/2025 9:48:37 AM
 
Notice Type
Solicitation
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24226B0007
 
Response Due
12/10/2025 9:30:00 AM
 
Archive Date
02/08/2026
 
Point of Contact
Devan Bertch, Contract Specialist
 
E-Mail Address
Devan.Bertch@va.gov
(Devan.Bertch@va.gov)
 
Awardee
null
 
Description
REPLACE SIDWALKS, STATION WIDE 528A6-25-614 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday Friday 8:00am 4:30pm. Current sidewalks, station wide, are deteriorating and in need of repair/replacement. The Scope of this project includes but is not limited to demolishing/removing existing sidewalks, preparing subbase, installing new concrete sidewalks, including ADA tactile warning surfaces, & restoring disturbed lawns. Scope of Work: Demolition: Contractor is to provide all labor, material, equipment, supervision, to complete demolition of existing sidewalks as well as an existing metal handrail near the south end driveway of B-76 as identified in the contract drawings. Contractor is required to dispose of all demolition at an approved location offsite. Site Work: Contractor is to provide all labor, material, equipment, supervision, to excavate unsuitable base material and place new subbase material as specified. Contractor is required to locate all underground utilities and is responsible for all costs associated with any utility strike or damage. Contractor is to form new sidewalks to be 6 feet wide, unless otherwise specified in the drawings, and to be a minimum of 6 thick with the specified reinforcement. Contractor is to pin new concrete sidewalk into existing sidewalk where applicable. Contractor is to install cast-in-place, cast-iron with epoxy coat finish ADA tactile warning surfaces where specified in the contract drawings. Contractor is to provide and install new black anodized steel hand railing as specified. Contractor is to coordinate all 3rd party testing necessary as specified. All work to be in compliance with contract drawings, and specifications. Code requirements: The installed product must, at a minimum, be in accordance with all applicable codes including Veterans Affairs standards which can be found at https://www.cfm.va.gov/til/. This will include, but not be limited to: Department of Veterans Affairs Design Manuals, VA Publications, and Construction Standards, National Fire Protection Code (NFPA), Life Safety Code, Underwriters Laboratory (UL), International Building Code IBC, National Electric Code (NEC), the VA Information Security Handbook 6500.6, Occupational Health and Safety (OSHA), and Environmental Protection Agency (EPA) requirements (to include Mold Remediation in Schools and Commercial Buildings). All work will be completed by certified individuals. Contract Drawings: Please see attached. Specifications: Please see attached. General Requirements: The contractor shall review the contract documents for conflicts. Where conflicts exist work shall not proceed until the COR has been notified and has given direction. Where incidental work is required to accomplish work shown on the drawings, this work is implied and shall be included as part of the base bid. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to work in the area and shall schedule a walkthrough with the COR to determine existing conditions. After the work, the existing work areas shall be returned to their original state before final approval shall be given. After the completion of construction, the contractor shall completely clean all surfaces of construction debris. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off station, and bring them to the job site. The Bath VA shall not accept deliveries for project purposes. The contractor shall prepare and submit an excel spreadsheet submittal log listing all submittals required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as necessary. The contractor shall not proceed with any on-site work until the completion of the submittal process or approval to proceed from the CO and COR without completion of the submittal process. Not less than 14 calendar days shall be planned for COR review of each submittal. Re-submittals shall be provided as required by the COR, and shall be treated as a new, separate submittal. Any non-lead time materials will only be paid for when installed. Any items identified as punch list items will be fixed prior to project closeout. Special care will be taken to secure tools and construction equipment during construction as this facility has patients in it. Work cleanliness must be adhered to throughout the project. Sounds and vibrations must be kept to a minimum to avoid patient disruption. The COR reserves the right to stop work if sound and vibrations are impacting patient living or employees. Off tour work may be required to minimize the impact on Veterans and employees. The contractor shall warranty all work including for 1 year from the date of acceptance. Warranty shall include any labor or parts necessary to ensure complete functionality of the new area. The contractor shall plan accordingly to stage and store materials in the contractor s designated area shown. The contractor shall be responsible for coordinating any traffic interruption with the COR. The contractor is responsible for providing traffic control personnel as needed during the period of the performance. Submittals: Submittals are required for all items outlined in the specification and include but are not limited to the submittals as shown in the submittal log. Project Duration: The total project duration for this project is not to exceed 120 days from the date of the NTP issuance. The period of performance for this project is expected to be from March 1st, 2026 to June 29th, 2026. This includes all processes starting with submission and approval of all submittals and ending with final punch list completion.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/1f834827ec484630ae7e46d5e95509bd/view)
 
Record
SN07636633-F 20251108/251106230037 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.