Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 08, 2025 SAM #8748
SOLICITATION NOTICE

Y -- WY FLAP SHE 26(1), Red Grade Road, Phase 1

Notice Date
11/6/2025 5:20:07 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF25B000010
 
Response Due
12/1/2025 1:00:00 PM
 
Archive Date
12/16/2025
 
Point of Contact
Laura Slauter, Kelly Palmer
 
E-Mail Address
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
 
Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PROJECT NUMBER: WY FLAP SHE 26(1) PROJECT NAME: Red Grade Road, Phase 1 PROJECT DESCRIPTION: The purpose of this project is to improve access to the Bighorn National Forest and Bureau of Land Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to US Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues. SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two schedules and one option: Schedule A is approximately 1.8-miles (~MP 1.0 to MP 2.8) and includes the majority of large cuts and retaining walls. Schedule B is approximately 2.6-miles (~MP 1.0 to MP 3.6), which includes the limits of schedule A and the remaining 0.8-miles. Option X includes the rehabilitation of the Aspen�s Parking Lot at ~MP 2.7 The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain. ANTICIPATED SCHEDULE: It is anticipated construction will begin May 2026 and end November 2027 with a winter shutdown. The work will be performed at high altitude (approximately 7,000 to 8,000 feet above sea level). Red Grade Road is closed to vehicles generally November through May because of snow. The road remains opened to tracked vehicles during this winter shutdown. The contractor will be allowed to close the road to public traffic on weekdays from 8 am to 12 pm and from 1 pm to 6 pm during construction. ESTIMATED COST RANGE: The estimated cost is $10,000,000 to $20,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/1634755ec7fa4435bd3188e1196579c5/view)
 
Place of Performance
Address: Arvada, WY 82831, USA
Zip Code: 82831
Country: USA
 
Record
SN07636836-F 20251108/251106230039 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.