SPECIAL NOTICE
Y -- Brandon Road Interbasin Project Industry Day - 7 April 2026
- Notice Date
- 3/27/2026 12:28:22 PM
- Notice Type
- Special Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- W07V ENDIST ROCK ISLAND ROCK ISLAND IL 61299-5001 USA
- ZIP Code
- 61299-5001
- Solicitation Number
- W912EK26BRIPID
- Response Due
- 4/7/2026 6:30:00 AM
- Archive Date
- 04/22/2026
- Point of Contact
- Samantha Johanson
- E-Mail Address
-
samantha.k.johanson@usace.army.mil
(samantha.k.johanson@usace.army.mil)
- Description
- The U.S. Army Corps of Engineers, Rock Island District invites you to an Industry Day on Tuesday 7 April 2026 from 8:30am � 12:00pm for the Brandon Road Interbasin Project. Agenda 8:30 - 9:00 a.m. Check-In 9:30 - 11:30 a.m. Presentation and Question and Answer Session Location: Davenport River Center - Arkansas Room 136 E 3rd St Davenport, Iowa 52801 **Please see the following link for registration for the Brandon Road Interbasin Project Industry Day.** https://forms.osi.apps.mil/r/EGBRszaBQX This is your opportunity to learn about this significant infrastructure project and how your company can be a part of it. Project Overview: The Brandon Road Interbasin Project is a critical control point in preventing Invasive Species, including Invasive Carp fish, from becoming established in the Great Lakes. This project will construct a series of deterrent measures in the lock chamber and approach channel. Once complete, a series of electric, hydroacoustic, and bubble deterrents will be operational while facilitating river navigation traffic. The project is broken into 3 construction increments (shown below). This presentation will focus on Increment II � Flushing Lock and Right Descending Bank Construction Contract. The purpose of this engagement is to provide contractors awareness of the upcoming contract and also to solicit feedback during this presentation regarding ways to improve the design to allow for more efficient and cost-effective construction. The project is designed in 3 construction increments, as follows: Increment I - Leading Edge Automated Barge Clearing (ABC) Deterrent Bubble Curtain Deterrent Acoustic Deterrent (Leading Edge) Leading Edge Support Facilities Upstream Boat Ramp Channel Rock Excavation Increment II � Flushing Lock and Right Descending Bank Flushing Lock (FL) Right Descending Bank (RDB) Wall Channel Rock Excavation Increment III - Engineered Channel Electric Deterrent Acoustic Deterrent (Eng Channel) Support Facilities Building Engineered Channel Floor & Walls Downstream Boat Ramp Industry Day Highlights: Attend the presentation with detailed information about the project scope, timeline, and specific requirements for each phase. Get your questions answered by USACE representatives and project engineers during Q&A. Provide feedback on how to improve design to allow for more efficient and cost-effective construction. Network with potential prime contractors, subcontractors, and suppliers to explore partnerships and innovative solutions. Presentation will include: Project Background Construction Phasing and Sequencing Status of Increment II Design Details of Increment II Design Industry Questions **Draft Plan Sets for the Flushing Lock and RDB Wall are attached below in the Attachments/Links section**
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/78b78b8cb98b470985e34312a7c3ed20/view)
- Place of Performance
- Address: Davenport, IA, USA
- Country: USA
- Country: USA
- Record
- SN07759932-F 20260329/260327230038 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |