Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 01, 2026 SAM #8892
SOLICITATION NOTICE

N -- Building Automation

Notice Date
3/30/2026 7:23:12 AM
 
Notice Type
Presolicitation
 
NAICS
2382 —
 
Contracting Office
FA5613 700 CONS PK APO AE 09021-3076 USA
 
ZIP Code
09021-3076
 
Solicitation Number
F3N0425344A001
 
Response Due
4/14/2026 7:30:00 AM
 
Archive Date
04/29/2026
 
Point of Contact
Damien Orozco, Phone: 3144895869, Autry Fontenot, Phone: 3144896787
 
E-Mail Address
damien.orozco.2@us.af.mil, autry.fontenot.2@us.af.mil
(damien.orozco.2@us.af.mil, autry.fontenot.2@us.af.mil)
 
Small Business Set-Aside
NONE No Set aside used
 
Description
1.1 DESCRIPTION OF INCIDENTAL SERVICES. The contractor shall provide a complete building automation system (BAS) including BACnet/IP based controllers, electric cabinets, sensors and acutuators for the HVAC systems of the buildings. All work shall conform to standard commercial practices, in accordance with (IAW) the technical regulations for workplaces, and electrical TUV/VDE requirements. This shall include testing and balancing of all controllers and the new application. In phase 1 an existing building will be renewed, and new HVAC systems and the BAS will be installed. In phase 2 a new building will be built and connected to the existing building. The contractor shall be responsible for: 1.1.1 Delivery of field devices Sensors and actuators for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room 1.1.2 Delivery of electric cabinet including building automation system for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.3 Delivery of Software program specially designed for the building automation system for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.4 Commissioning and as built documentation for the building automation system for phase 1 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.5 Delivery of field devices Sensors and actuators for phase 2 - heating circuit vehicle bay - Utilities room phase 2 1.1.6 Delivery of electric cabinet including building automation system for phase 2 - heating circuit vehicle bay - Utilities room phase 2 - Connection to ventilation system vehicle bay - Connection to the control system of the doors - various fault messages 1.1.7 Delivery of Software program specially designed for the building automation system for phase 2 - heating circuit vehicle bay - Utilities room phase 2 - Connection to ventilation system vehicle bay - Connection to the control system of the doors - various fault messages 1.1.8 Commissioning and as built documentation for the building automation system for phase 2 - heating circuit - hot water preparation - Utilities room - Telecom room - Connection to air handling unit - Connection to metering - Connection to cooling units - hygienic rinse - various fault messages 1.1.9 BACnet/IP data points to be named IAW ASHRAE 135, VDI 3814-1, and Ramstein Points Naming Convention 1.1.10 Prior to final Government acceptance, all as-built documents, warranty documentation, EDE Files shall be handed over as hard copies and/or secure electronic transfer (DOD SAFE). 1.2 ADDITIONAL TECHNICAL DESCRIPTION 1.2.2 All controllers to be BACnet/IP based, IAW ASHRAE 135 � 2020 and BTL certified. 1.2.3 Setpoints, trending, and alarms are to be determined by the Government. 1.2.4 To maintain system standardization and utilize available resources, all KMC buildings are to be uniformly equipped with BTL-certified building automation systems, preferably of the brand Kieback & Peter DDC4000, alternatively Siemens PXC4...PXC7. Only building automation systems from these two manufacturers, including all associated components, are permitted for use. 1.2.5 The contractor shall include project commissioning and submit a commissioning final report. Critical aspect of the project include ensuring that systems and components are designed, installed, tested, operated, and maintained according to the operational requirements. � Quality assurance � Cost-effectiveness � Improved efficiency � Enhaced safety � Compliance with regulations FAR 52.225-5, Trade Agreements�One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/d8917f1d5e5e4d9db89c1ceba43f4cb7/view)
 
Place of Performance
Address: Kaiserslautern , DE-RP, DEU
Country: DEU
 
Record
SN07761396-F 20260401/260330230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.