Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 10, 2026 SAM #8901
SOLICITATION NOTICE

56 -- Emergency Buy: Type 1 River Rock, Missouri River Mile 52.8, Kansas City District USACE

Notice Date
4/8/2026 6:58:21 AM
 
Notice Type
Solicitation
 
NAICS
212319 — Other Crushed and Broken Stone Mining and Quarrying
 
Contracting Office
W071 ENDIST KANSAS CITY KANSAS CITY MO 64106-2896 USA
 
ZIP Code
64106-2896
 
Solicitation Number
W912DQ26QA053
 
Response Due
4/10/2026 6:00:00 AM
 
Archive Date
04/25/2026
 
Point of Contact
Seth Balsters, Phone: 8163893566, Laura Hedrick, Phone: 8163893023
 
E-Mail Address
seth.b.balsters@usace.army.mil, laura.l.hedrick@usace.army.mil
(seth.b.balsters@usace.army.mil, laura.l.hedrick@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Please See Attached for Solicitation Details Amendment updates SOW to clarify Missouri River river mile 52.8. Q&A: Q1. Is a gradation test required prior to shipping material? A1. No Q2. No geological requirements are associated with the stone, what are the requirements in order to be considered durable stone. For instance, freeze thaw requirements, specific gravity? A2. Bulk specific gravity saturated surface-dry basis, method ASTM C 127 - not less than 2.40. Soundness in freezing and thawing method for ledge stone, Method CRD-C 144-92 loss at 20 cycles - not more than 25 percent for at least 50 percent of the face height to be quarried. Q3. Please specify what are acceptable methods for loading material on the Government Owned barges. Will the government provide a ramp barge so trucks can dump directly onto the barge, does the contractor need to transload with a material handler or equivalent. A3. A government furnished loading dock will be available for loading. The trucks or loading equipment will enter on to the dock barge and dump the rock onto the material barges. If the vendor does not already have an established and suitable loading facility on the Missouri River then they will need to provide the land. The location of the land must allow for the necessary draft, room for ingress and egress of tow boats and material barges, and bank height suitable to lower the loading ramp onto. Q4. Does contractor supplying material need to have a CQM credentialed staff submitted for this project. A4. No Q5. Is the contractor responsible for identifying the load out near 52.8? If so, what is the acceptable range for being considered nearest? A5. If the vendor does not already have an established and suitable loading facility on the Missouri River then they will need to provide the land. The location of the land must allow for the necessary draft, room for ingress and egress of tow boats and material barges, and bank height suitable to lower the loading ramp onto. The range is determined by the loading facility's location which is determined by the vendor. Q6. Is this a 100% Total Small Business Set-Aside under NAICS 212319? A6. Yes.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/941f898a153a4e788da0314a2ccc054c/view)
 
Place of Performance
Address: Washington, MO 63090, USA
Zip Code: 63090
Country: USA
 
Record
SN07772425-F 20260410/260408230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.