Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 30, 2026 SAM #8951
SPECIAL NOTICE

99 -- United States Space Command (USSPACECOM) Command and Control Facility (C2F): Owner�s Advisor (OA) for Collaborative Design-Build Delivery

Notice Date
5/28/2026 6:17:47 AM
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
DEPT OF DEFENSE
 
ZIP Code
00000
 
Response Due
6/30/2026 2:00:00 PM
 
Archive Date
07/01/2026
 
Point of Contact
Sarah Evans, Scott Helmore
 
E-Mail Address
sarah.d.evans5.civ@army.mil, scott.helmore@onenationinnovation.org
(sarah.d.evans5.civ@army.mil, scott.helmore@onenationinnovation.org)
 
Description
Air Force Civil Engineer Center (AFCEC) seeks a partner to serve as an OA for programmatic management during the planning, design and construction of the USSPACECOM C2F at Redstone Arsenal, AL, and to establish a scalable, repeatable model to be implemented in future Air Force Military Construction projects. Summary of Overall Objective: AFCEC seeks an innovative, highly capable, and deeply experienced partner to serve as the OA for management of design and construction of a new C2F warfighting platform at Redstone Arsenal, Alabama. This mission critical facility, and its supporting data center, is required to support approximately 1,800 personnel and cost approximately $2B to design and build. C2F will incorporate Radio Frequency (RF) shielding, High-Altitude Electromagnetic Pulse (HEMP) protection, Sensitive Compartmented Information Facility (SCIF) / Special Access Program (SAP) construction, and redundant and resilient infrastructure. The project will be delivered using a collaborative delivery methodology under the Design Build Institute of America (DBIA) Design Build Done Right framework. The OA partner will help co-create a repeatable, scalable model for Collaborative Delivery Design Build management success across the Department of the Air Force for possible future acquisitions. This effort is intended to reduce traditional Military Construction (MILCON) delivery timelines by approximately 50%, transforming what is typically a 10-year process into an approximate 5-year requirement to construction completion process. The selected OA will help AFCEC deliver this facility faster, smarter, and with higher mission assurance than any previous Air Force MILCON effort. USSPACECOM will complete its validated requirements development in late June 2026, and the OA must be prepared to rapidly translate these requirements into actionable technical criteria, performance standards, and design guidance. As the project progresses, the OA will also perform construction oversight and construction security. AFCEC will not be prescriptive in requiring a response, instead we are asking industry to present their most creative solutions based on their experience and qualifications. Futher information is listed in the two attachments provided.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/c2d384c440b947fababb31780afa9a15/view)
 
Place of Performance
Address: Huntsville, AL, USA
Country: USA
 
Record
SN07832120-F 20260530/260528230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.