Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 31, 2026 SAM #8952
SOURCES SOUGHT

J -- Building 35 Chiller Replacement

Notice Date
5/29/2026 7:40:19 AM
 
Notice Type
Sources Sought
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
W7M9 USPFO ACTIVITY KSANG 184 MCCONNELL AFB KS 67221-9000 USA
 
ZIP Code
67221-9000
 
Solicitation Number
PANNGB26P0000036080
 
Response Due
6/8/2026 7:00:00 AM
 
Archive Date
06/23/2026
 
Point of Contact
Kevin Smith, Phone: 3167597591, Joshua Kingori, Phone: 3167597590
 
E-Mail Address
184wg.msg.contracting@us.af.mil, 184WG.MSG.CONTRACTING@us.af.mil
(184wg.msg.contracting@us.af.mil, 184WG.MSG.CONTRACTING@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This is a SOURCES SOUGHT ANNOUNCEMENT ONLY. The purpose of this sources sought is for market research to gain knowledge of potential sources for future needs including interested small business sources. This notice is for planning purposes only. All interested parties should respond. Kansas Air Nationl Guard, McConnel AFB, Kansas, will soon be soliciting for a project for Building 35 Chiller Replacement. Work shall consist of the following: Replace existing 80 ton chiller unit with new Trane 80 ton chiller with 134A refrigerant or equivalent. The contractor will be responsible for the removal of the existing unit, including disposal of refrigerant, and installation of the replacement chiller ensuring that the new unit is properly grounded. This may require the contractor to utilize a crane to remove and replace the units. Update Direct Digital Control (DDC) system as necessary to correspond with new chiller unit. The existing chiller is set on a concrete pad northeast of Building 35 that can be reutilized if the new unit final dimensions match the current size of the existing unit, otherwise it will be the responsibility of the contractor to expand the pads as needed. Electrical will be available and it is the contractor�s responsibility to ensure all panels / breakers are updated to meet the standards of the new chiller unit. Current power is 460V with 500 kcmil conductors. New unit will utilize this electrical connection and voltage. Water piping is 4"". New unit will utilize this size pipe. Additional information: Contractor will need to install a 4� T-valve to allow for the hook-up of a temporary chiller should the new units fail or require servicing. Should concrete pad expansion be required, contractor to use reinforced 4000 psi concrete to match thickness and elevation of existing pad. For this requirement, the small business size standard is 19 Million for NAICS 238220. In the event small business contractors are not avaialble for adequate competition for this project, it may be advertised as unrestricted. Complete and return attached sources sought form to include bonding capability and advise on your capabilities and or past perfromance in terms of the projected requested. Include the following email subject line ""Sources Sought B35 Chillier Replacement"" when emailing, to 184WG.MSG.CONTRACTING@us.af.mil. Use the same email address if you have additional questions.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/a2ea6b66beb9496cb7da8531b9c1d4c0/view)
 
Place of Performance
Address: McConnell AFB, KS 67221, USA
Zip Code: 67221
Country: USA
 
Record
SN07834568-F 20260531/260529230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.