Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF OCTOBER 01, 2026 SAM #9075
AWARD

Y -- N6945026R0026 Wharf Bravo, Naval Air Station (NAS) Pensacola, Florida

Notice Date
9/29/2026 12:09:41 PM
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NAVFACSYSCOM SOUTHEAST NAS JACKSONVILLE FL 32212-0030 USA
 
ZIP Code
32212-0030
 
Solicitation Number
N6945026C0040
 
Archive Date
10/13/2026
 
Point of Contact
Deborah D Torrence
 
E-Mail Address
deborah.d.torrence2@us.navy.mil
(deborah.d.torrence2@us.navy.mil)
 
Award Number
N6945026C00400
 
Award Date
09/28/2026
 
Awardee
ORION GOVERNMENT SERVICES LLC Houston TX 77020 USA
 
Award Amount
43839414.77
 
Description
This project is to repair and recapitalize Wharf Bravo and associated utilities at NAS Pensacola, Florida to ensure continued operational support for U.S. Coast Guard missions. The recapitalization effort will extend the service life of the wharf, improve structural integrity, and modernize utility systems to meet current operational requirements. The project includes, but is not limited to, the following major components: Structural Repairs, Mooring and Fender Systems, Wharf Hotel Services, Pavement and Drainage, and Incidental Work. Expected structural repairs include casting new concrete fascia over the existing steel combi-wall, replacing the concrete cap along the wharf, repairing holes in sheet piles, installing a galvanic cathodic protection system, and repairing and reinforcing tie-back anchors. Project includes mooring and fender systems requirements such as replacing mooring hardware and timber fender system, installing new mooring bollards, cleats, and foam-filled fenders, and each mooring bollard will include a tie-back anchor for enhanced stability. Anticipated wharf hotel services involve replacing utility systems including potable water, fire water, sanitary sewer (CHT), and electrical shore power stations. Project expected pavement and drainage requirements include removing existing pavement surfaces to access buried utilities and structural elements, repairing steel combi-wall and tie-back system, installing tie-back anchors at mooring bollards, replacing pavement with new asphalt surfaces, and constructing a stormwater drainage system with detention basin for improved runoff management. Incidental work will include all related incidental construction, demolition, and site restoration necessary to complete the recapitalization effort. Period of Performance is 548 calendar days for the Base Bid and 365 days for Option 0001.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/8b2a92a16af447bfbca919d549ee91ae/view)
 
Place of Performance
Address: Pensacola, FL 32508, USA
Zip Code: 32508
Country: USA
 
Record
SN07989568-F 20261001/260929230040 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.