SPECIAL NOTICE

S -- Future Smart Grid Build-outs

Notice Date
9/29/2026 3:35:30 PM
 
Notice Type
Special Notice
 
NAICS
221122 — Electric Power Distribution
 
Contracting Office
NAVFACSYSCOM MID-ATLANTIC NORFOLK VA 23511-0395 USA
 
ZIP Code
23511-0395
 
Response Due
10/14/2026 1:00:00 PM
 
Archive Date
10/29/2026
 
Point of Contact
Aaliyah Fortson, Michael Brice, Phone: 7573410695
 
E-Mail Address
aaliyah.a.fortson.civ@us.navy.mil, michael.brice@navy.mil
(aaliyah.a.fortson.civ@us.navy.mil, michael.brice@navy.mil)
 
Description
Joint Expeditionary Base Little Creek-Fort Story (JEBLCFS) would like to develop an economically viable energy conservation project that includes: Identify and evaluate solutions to repurpose/decentralize steam production assets for on-site power generation and battery storage, providing black-start capability during power outages. Convert steam mechanical systems to gas and/or electric systems in several of our facility. Investigate HVAC and LED lighting Energy Conservation Measures (ECMs) for several of our facilities. Investigate opportunities to expand facility-related control systems (FRCS) to support smart grid operations distribution network with a Supervisory Control and Data Acquisition (SCADA)-enabled system. Evaluate options to improve water resiliency for critical mission facilities. Construct a smart grid backbone to replace the aging manual electrical distribution system and optimize power generation to improve electrical resiliency across the installation. Hardening the electrical distribution system. This project positions the installation for future smart grid build-outs�including on-site renewable energy systems, battery storage, advanced controls, decentralization, and full steam plant repurposing�while converting lighting systems to LEDs to reduce energy consumption and utility costs. JEB LCFS plans to use a Utility Energy Service Contract (UESC) to implement these requirements at our facilities. We are surveying the interest of all electric, natural gas, and water distribution utilities to provide UESC services at multiple facilities and site (with corresponding utility accounts) within the utility�s franchise service territory. NAVFAC MidAtlantic intends to award a UESC Task Order under the GSA areawide contract (AWC). In the absence of an AWC, NAVFAC MidAtlantic will also consider awarding the UESC via a Separate Contract or a Basic Ordering Agreement (BOA). The Contractor (Utility/ Energy Service Company [ESCO]) shall select ECM subcontractors (including suppliers) on a competitive basis to the maximum practical extent consistent with the objectives and requirements of the contract. The selected utility shall provide the following during the UESC process: A Preliminary Assessment (PA) offered at no cost to the Government; following the PA, an Investment Grade Audit (IGA) may be requested Specific requirements for each assessment will be provided at the time of the request Financing (if applicable) which must be competed eProject Builder (ePB) is required for Task Order (TO) schedules; the TO Schedules should be provided for the PA, and the IGA Performance Assurance Plan to ensure ECMs are installed and perform as designed. If your company is prepared to pursue a UESC, please send an email to Michael N. Brice at michael.n.brice2.civ@us.navy.mil to indicate your interest. If I do not hear from you within 14 business days, I will consider that a negative response and that your company is not interested in pursuing a UESC for the noted facilities at this time. Please refrain from contacting other individuals at JEBLCFS at this time.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/0ea71f44d3924fe881fc89fb7984df8b/view)
 
Place of Performance
Address: Virginia Beach, VA, USA
Country: USA
 
Record
SN07990231-F 20261001/260929230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.