Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF OCTOBER 02, 2026 SAM #9076
SOLICITATION NOTICE

S -- Fort Hood Installation Custodial Services

Notice Date
9/30/2026 3:40:24 PM
 
Notice Type
Solicitation
 
NAICS
561720 — Janitorial Services
 
Contracting Office
W6QM MICC-FDO FT HOOD FORT HOOD TX 76544 USA
 
ZIP Code
76544
 
Solicitation Number
W91151-26-R-A004
 
Response Due
10/7/2026 8:00:00 AM
 
Archive Date
10/22/2026
 
Point of Contact
Robert Sanchez, MSG Justin Mansfield
 
E-Mail Address
robert.l.sanchez3.civ@army.mil, justin.j.mansfield.mil@army.mil
(robert.l.sanchez3.civ@army.mil, justin.j.mansfield.mil@army.mil)
 
Small Business Set-Aside
HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
 
Description
UPDATE (2026-09-30): Amendment 0003 is posted. The purpose of this Amendment is to: Attachment 7 - DoD SAFE Instructions: All proposal submissions must be made exclusively through the DoD SAFE portal in accordance with the procedures detailed in this attachment. Effective upon the posting of this amendment, submissions made via standard email will not be accepted or evaluated. Attachment 8 - Solicitation Clarifications 2026.09.29: This document provides the Government's final and definitive responses to key industry questions. All offerors are required to review this attachment in its entirety. Attachment 9 - Industry Questions 2026.09.29 UPDATED: This document has bold and highlighted areas that were updated. UPDATE (2026-09-25): Amendment 0002 is posted. The purpose of this Amendment is to: Extend the solicitation closing date from September 24, 2026 to October 7, 2026, at 10:00 AM (CST). Increase the maximum page limit for Volume II - Technical Proposal from twenty-five (25) pages to thirty-five (35) pages. Eliminate the requirement for offerors to submit redacted versions of proposal documents. Remove ""Subfactor 6: Annex - Mission-Essential Contractor Services Plan"" from the Addendum to FAR 52.212-1. Offerors are still required to submit this plan as part of their proposal package; however, it will not be formally evaluated as a rated subfactor. Amend the Addendum to FAR 52.212-2, Subfactor 3: Phase-in, to state that office space in Building 4819 will be provided by the Government at no cost to the contractor, and to remove the requirement for the procurement and establishment of a contractor-furnished building. This amendment formally supersedes all prior guidance, instructions, and Q&A responses contained in Amendment 0001 regarding redacted documents, the Mission-Essential Contractor Services Plan, and the contractor-furnished building requirements. UPDATE (2026-09-24): Amendment 0001 is posted. The purpose of this Amendment is to: Formally respond to Industry questions received through 18 September 2026. Extend the proposal receipt closing date. Correct conflicting small business set-aside clauses. Correct and conform Section L (Proposal Preparation Instructions) and Section M (Evaluation Criteria). Correct typographical errors in the CLIN Schedule and PWS paragraph cross-references. Updated Attachments 1, Attachment 3, Attachment 4, TE-A, and TE-L UPDATE (2026-09-22): Currently extending Solicitation until 29 September 2026 at 12:00PM CST. An amendment will be posted with the Industry Inquiries received through 18 September 2026. A Solicitation Amendment is forthcoming along with updating documents. Please watch SAM.gov for more information EDIT (2026-08-26): Attachment 1 � Performance Work Statement for Installation Custodial Services has been re-uploaded in a viewable format due to an error with the previously posted file. The requirement is for Installation Custodial Services supporting Fort Hood and the Belton Lake Outdoor Recreation Area, including the Warrior Transition Unit and Child Youth Services, across approximately 432 buildings totaling about 3.65 million square feet. The service categories include Basic 1-Day, 3-Day, 5-Day, and 7-Day Services, as well as Enhanced 5-Day Services. Site Visit: The Government will hold a site visit at numerous buildings on Fort Hood, Texas on September 16, 2026, with the site visit beginning at 10:00am (CST) at 575 Sherman Street (Building 40001, Room 203), Fort Hood, Texas. A visitor's pass is required for access to the Fort Hood installation, and it can take up to an hour to acquire one. Attendees should plan to arrive early in order to obtain their visitor's pass and arrive at the site visit on time. All questions regarding this solicitation shall be submitted in writing via email not later than September 18, 2026 by 12:00pm (CST) to the Contracting Officer and Contract Specialist identified below: Contract Specialists: Robert (Bob) Sanchez, robert.l.sanchez3.civ@army.mil Contracting Officer: MSG Justin Mansfield, justin.j.mansfield.mil@army.mil
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/a6c846a6d52e4c609d2a14bc2b9a2c8a/view)
 
Place of Performance
Address: Fort Hood, TX 76544, USA
Zip Code: 76544
Country: USA
 
Record
SN07991711-F 20261002/260930230039 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.