Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 2,1995 PSA#1275

Accounting Section, Construction and Maintenance, Division, Minister's Secretariat, Ministry of Justice, 1-1-1 Kasumigaseki, Chiyoda-Ku, Tokyo 100

99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/26/95 PG. 2. DUE 140095 POC Tel 81/3/3592-7027 S1542 Construction of prison building opening time and date 14:00, mar. 15, 1995. Open 1) Construction Title Construction of prison building for the onomichi Branch prison; 2) site 23-2 boji-Cho, onomichi-Shi, hiroshima-Ken; 3) summary a) use of building for prison facility; B) structure and number of stories reinforced concrete Construction, four stories above building; and C) size of building land area 1,300 square meters, total floor area 3,900 square meters, site area 36,534 square meters; 4) Construction period approx. 12 months (360 days); 5) main materials to be used approx. 3,400 cubic meters of concrete, approx 400 tons of reinforcing steel; 6) deadline for submission of application forms/related documents for qualification screening 17:00, feb. 6, 1995; 7) contact for tender documents Accounting Section, Construction and Maintenance Division, Minister's Secretariat, Ministry of Justice, 1-1-1 Kasumigaseki, Chiyoda-Ku, Tokyo 100; procured by masahiko yoshida, Director, hiroshima prison eligible tender participants 1) firms that do not fall under articles 70 and 71 of the cabinet order concerning budget, auditing, and Accounting; 2) firms qualified by the Ministry of Justice for open competitive fy 93/94; 3) firms that score 1,000 points or more in the overall ''P'' value calculated from bidding company's Management criteria at the time of application for qualification; 4) firms not undergoing bankruptcy procedures; 5) firms that have since 1989 actually carried out Construction of a Public building made of reinforced concrete, at least four stories, and at least 4,000 square meters total floor area note: only Construction Projects in which bidder has had a 30 percent or greater share are eligible for consideration; 6) firms that can assign to the Construction site a pull- time chief engineer or engineering supervisor who meets the following criteria a) is qualified as a certified First-class Construction supervisor or architect; B) has since 1989 had Construction experience as described in item (5) above; and C) in the case of engineering supervisor, is qualified to supervise designated Construction works; 7) firms not currently suspended from designation by the Director of the Accounting Division of this Minister's Secretariat; and 8) firms not relatbd by capital or personnel to the contractors involved in this Project bid documents must be obtained directly from the submitting agency, not from U S. Embassy. Date of publication in ''kensetsu kogyo shimbun'' 012695. Post contact/prepared by gtaevs Please send a copy of your response to: Commercial Section (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0284.. (0031)

Loren Data Corp. http://www.ld.com (SYN# 0425 19950201\99-0003.SOL)


99 - Miscellaneous Index Page