COMMERCE BUSINESS DAILY ISSUE OF MARCH 13,1995 PSA#1301U S ARMY ENGINEER DISTRICT, MOBILE, CONTRACTING DIVISION (CESAM-CT), P
O BOX 2288, MOBILE AL 36628-0001 Z -- REPLACE SWITCHGEAR, BUILDING 9-B, PN 5955328 SP 17-06, HOLSTON
AAP, TN SOL DACA01-95-B-0059 DUE 040495 POC Contact Mr. Earl Davis,
334/690-2535, Contracting Officer, Gene L. Curtis (Site Code DODAAC)
Delete, ''PRE-SOLICITATION NOTICE,'' Replace two sections of switchgear
and all associated equipment. Includes new metal clad switchgear,
vacuum circuit breakers and state of the art relaying system. Also
includes the replacement of feeder conductors, secondary potheads and
feeder circuits. Critical Path Method (Network Analysis System) is not
required. Bid documents are available on or about 03 March 1995. Costs
are as follows: Plans half size $5.00. Specifications $20.00. Estimated
cost is between $500,000 and $1,000,000. Unrestricted. Requests for
Plans and Specifications shall indicate in writing whether Firm will
bid as a Prime contractor or a Subcontractor. All responsible sources
may submit a bid(0068) Loren Data Corp. http://www.ld.com (SYN# 0191 19950310\Z-0031.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|