COMMERCE BUSINESS DAILY ISSUE OF june 20,1995 PSA#1371GSA, PBS, Property Management (4PMP),Suite 2500,401 West Peachtree St.
NW,At lanta,GA 30365-2550 Z -- DESIGN AND INSTALL NEW CHILLERS SOL GS-04P-95-EWC-0225 DUE 082495
POC Contact,Floria Standifer,404/331-5844,Contracting Officer,Susan J.
Odom,404 /331-5844 Claude D. Pepper Federal Building, Miami, Florida-
Design and Build Chillers for the Claude D Pepper Federal Building in
Miami, FL. Work includes: remove existing chillers, pumps and pipings;
install new pumps and pipings; install a desiccant unit to remove
mositure from fresh air; install building energy management system;
install a new cooling coil; and any electrical work needed for new
equipment. Estimated cost range: $500,000 to 1,000,000. Completion time
is 260 calender days. Plans and specifications are available approx.
07/18/95. Request for plans, specifications and bidder's mailing list
should be made in writing to the above contracting office, or faxed to
(404) 730-9722, Attn: Paula Lee. All responsible sources may submit a
bid which will be considered by the agency. (0167) Loren Data Corp. http://www.ld.com (SYN# 0248 19950619\Z-0079.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|