|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 23,1995 PSA#1374Procurement Division, General Affairs Department, Third, Construction
Bureau, Honshu-Shikoku Bridge Authority, Hotta Bldg., 1-9-22 Shinhama,
Onomichi-Shi 722, Japan Y -- JAPAN: S16 CONSTRUCTION POC Tel 81/848/22-5211 FAX N/A. product
data a industry sector code: B detailed product description:
Construction Title: Construction of steel superstructure for the tatara
overpass; site: from oaza-iguchi-chisaki to oaza-iguchi, kamiura-cho,
ochi-gun, ehime-ken; summary: this project involves Construction of
steel superstructure for the tatara overpass (length: 208.5 meters for
the ''up'' route; 820.3 meters for the ''down'' route; width: 9.5
meters) on the imabari route of the Honshu-Shikoku linking highway.
This overpass links to the tatara large Bridge and is made up of a
three-span continuous, steel box-girder Bridge, a seven- span
continuous, steel box-girder Bridge, and a four- span continuous, steel
plate-girder Bridge (2 X 69 meters + 68. 4 meters, 61.35 meters + 5 X
62 meters + 61.35 meters, 43.95 meters + 2 X 44.45 meters + 43.95
meters); estimated tonnage: steel superstructure, approx. 3,620 tons;
Construction period: 910 days; main materials to be used: steel,
approx. 3,620 tons. C product specifications/technical data: N/a (not
available). D quantity: N/A. e U.S. dollar value: N/A. F other
information: N/A. response data a response language: Japanese. B best
way to respond: letter. C from manufacturers only: N/A. D information
desired from U.S. firm: N/A. e primary buying factor: the lowest bid
within the estimated price range. F other information: pre-screening is
required to be eligible for bidding. Pre-screening deadline: 16:00 pm,
July 20, 1995. Bid Documents must be obtained directly from the
procuring agency, not from U.S. Embassy. Payment in yen. A issuing
agency: Honshu-Shikoku Bridge Authority B financing agency: same as
above. C price of bid Documents: N/A. D purchase bid Documents by:
16:00 pm, aug. 24, 1995. E tender number required in all
communications: N/A. F performance bonds required: not required. G
closed Procurement procedure: no. H bidding procedures: open
competitive tender. I bid deadline: 14:00 pm, sep. 12, 1995. J other
information: ''kensetsu kogyo shimbun'': 6/19/95. Eligible tender
participants must be pre-qualified firms that meet the following
criteria: 1) firms that do not fall under any of the following
categories: a) firms that have not received a permit from the
Construction minister or the prefectural governor under article 3 of
the Construction business law regarding this project; B) firms that
have not been rehabilitated from insolvency or bankruptcy; C) firms
that have -- in the past two years, in a contract -- deliberately
performed a poor work, or unfairly cheated on quality and quantity of
materials; interfered with fair competition, damaged fair pricing, or
colluded for unfair profit; prevented a winner from signing a contract,
or a contractor from carrying out a contract; prevented an Official
from conducting supervision or inspection; unjustifiably reneged on a
contract; presented false Documents to this Authority; brought this
Authority other extreme losses; and employed, as representative,
manager, or equivalent in a contract, those who perpetrated one of the
above-described Acts within two years of their misconduct; and D)
firms whose business is judged extremely unsound; 2) consortia
comprised of firms pre-qualified for competitive bidding on steel
superstructure work by this Authority for goj fy 95/96; 3) all member
firms must score at least 1,200 points in steel superstructure work in
a formula calculated from bidding company's objective criteria at the
time of application for qualification; 4) all member firms must have
-- in the past, as the main contractor -- completed a similar project
(Construction of a multi-span continuous, steel box-girder Bridge of at
least two lanes, 50 meters in maximum span length, and 250 meters in
total length); 5) firms that can assign to the Construction site a
field representative or a chief engineer or engineering supervisor who
has completed a similar project in the past as the main contractor; 6)
all member firms must not be currently suspended from designation by
the Director of this Authority in areas including the ehime prefecture;
7) firms that can present an adequate plan for this project; 8) all
member firms must not be related by capital or personnel to the
contractors involved in this project (see tender Documents for
details); and 9) consortium must be organized as follows: a) the number
of member firms must be two or three; B) all member firms must have at
least six-tenths of the equally divided share of involvement; C) the
representative firm must have the greatest share of involvement among
all members; D) consortium must be organized by the ''ko'' method; e)
the same firm cannot belong to two or more consortia regarding this
project; and F) a notice on Organization of consortium for designated
Construction project must be submitted as an attachment to the
application Documents for pre-qualification; a letter of proxy must
also be submitted if the name of a proxy, such as a branch manager,
etc., Appears in the submitting Documents. Post remarks Post
contact/prepared by haomori approved by gtaevs/cdukelow Please send a
copy of your response to: Commercial Officer (FCS TOP), American
Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC421. Please note:
All correspondence with the Awarding Authority and/or the Procuring
Agency MUST be in Japanese..(0172) Loren Data Corp. http://www.ld.com (SYN# 0119 19950622\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|