COMMERCE BUSINESS DAILY ISSUE OF JUNE 26,1995 PSA#1375U.S. Department of Energy, Western Area Power Administration, P.O. Box
3402, ATTN: A1520, 1627 Cole Blvd., Bldg. 18, Golden, CO 80401 Y -- CONSTRUCTION OF MEAD SUBSTATION, STAGE 07 SOL DE-FB65-95WG27286
DUE 081495 POC Dorothy Paquet, Contract Specialist, (303) 275-1529,
James E. Dickey, Contracting Officer. Contractor shall provide all
labor, material, and equipment necessary to construct the Mead
Substation (Stage 07). The work includes: clearing and excavation of
substation site, excavation for structures, installing corrugated metal
pipe, PVC pipe and concrete pipe, fencing, gravel surfacing, seeding,
concrete, metalwork; installing Government-furnished autotransformer,
power circuit breakers, current transformers, coupling capacitor
voltage transformers, interrupter switch, disconnecting switches, line
trap, unmounted devices on existing duplex switchboard, insulated
conductors and cables, and bus systems; furnish and install grounding
system, conduit, and substation signs; removing transmission line
materials, electrical equipment, steel structures, wood pole
structures, and cutting off concrete foundations; furnish and install
steel lattice structure, transmission line spans, and accessories.
Unrestricted solicitation. All responsible bidders will be considered.
Estimated cost of the project is between $500,000 and $1,000,000.
Period of Performance: Project must be completed no later than April 1,
1996. Place of Performance: Clark County, Nevada. Requests for the IFB
should be sent to the Department of Energy at the above address with
a non-refundable check for $20.00. The bid package will be available
on/about February 10, 1995, and will be issued hard copy only. All
request for this solicitation must be in writing. Information hours:
7:30am - 4:30pm (MST), Monday thru Friday. (0173) Loren Data Corp. http://www.ld.com (SYN# 0132 19950623\Y-0009.SOL)