COMMERCE BUSINESS DAILY ISSUE OF JULY 5,1995 PSA#1381U. S. ARMY ENGINEER DISTRICT, MOBILE, ATTN: CESAM-CT (PLANS ROOM NO.
1000A), P. O. BOX 2288 MOBILE ALABAMA 36628-0001, OR 109 ST. JOSEPH
STREET MOBILE AL 36602 Z -- REPAIR ELECTRICAL DISTRIBUTION PHASE VII, REDSTONE ARSENAL,
ALABAMA SOL DACA01-95-B-0140 DUE 082295 POC Contact Mr. Earl Davis,
334/690-2535; Contracting Officer, Gene L. Curtis (Site Code DODAAC)
The work consists of replacing Unit Substation #2. The work involves
installing 2 - 7.5 MVA transformers, circuit breakers, associated
switching equipment and conversion of existing pole lines from 4 KV to
12 KV. This solicitation contains Optional Items for Additional work.
Critical Path Method (Network Analysis System) is required. Critical
Path Method (Network Analysis System) is required. Bid documents are
available on or about 21 July 1995. Costs are as follows: Plans half
size $23.00. Specifications $28.00. Estimated cost is between
$1,000,000 and $5,000,000. Requests for Plans and Specifications shall
indicate in writing whether Firm will bid as a Prime contractor or a
Subcontractor. Unrestricted. All responsible sources may submit a bid
which shall be(0181) Loren Data Corp. http://www.ld.com (SYN# 0365 19950703\Z-0117.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|