COMMERCE BUSINESS DAILY ISSUE OF JULY 10,1995 PSA#1384USPFO for Washington, ATTN: Contracting Office, Bldg 32, Camp Murray,
Tacoma, WA 98430-5170 Z -- REPAIR POWER DISTRIBUTION SYSTEM, SPOKANE INTERNATIONAL AIRPORT,
WASHINGTON AIR NATIONAL GUARD STATION, WA SOL DAHA45-95-B-0009 POC
Joanie Dobesh, Contracting Office, 206/512-8311; LtCol Daniel Hirst,
Project Officer, 509-247-7352 Furnish all plant, labor, equipment,
materials, tools and other items required to remove and replace the
existing overhead primary distribution system with a new underground
distribution system. The work includes, but is not limited to, new pad
mounted transformers, above grade termination cubicles, manholes and
an underground, concrete encased, duct bank containing insulated and
shielded high voltage cables and a ground wire. New street lighting
poles and fixtures will be provided. ECC is between $100,000 and
$500,000. Time of completion is 120 calendar days from the receipt of
the Notice to Proceed. Solicitations will be available on or about 25
July 1995 on a first come, first serve basis by written or faxed
requests. FAX number, 206-512-8933. The proposed construction is a 100
percent set-aside for small disadvantage business concerns (SDB).
Requests for solicitations from prime contractors will not be honored
if they do not certify that they are an SDB. See Note 4. (0187) Loren Data Corp. http://www.ld.com (SYN# 0308 19950707\Z-0089.SOL)