Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 18,1995 PSA#1390

U. S. Army Corps of Engineers, Omaha District, 215 North 17th Street, Omaha, NE 68102-4978

Y -- FIRE FIGHTER TRAINING FACILITY, GENERAL MITCHELL IAP - ARS, WI. SOL DACA45-95-B-0099 DUE 090795 POC Contact Contracting Division at: (402)221-4266. The work will include the following: (Approx. quantities) Removal of an underground fuel storage tank, oil/water separator, lift station, aircraft mockup and contaminated soil. New construction consists of a 150' dia burn pit area; 95' pipe trench lined with layers of geotextile fabric, sand, and a HDPE lines (60 mil); crushed rock surface in burn pit, 50' drive around area, and entrance drive, a steel aircraft mockup; structural steel control tower; liquid propane fuel system and appurtenances; lift station; water and drain lines; electrical system to include 50 KVA transformer, lighting, service rack, cathodic protection, igniter system, and all conduit and wiring; clearing and grubbing; fencing; and concrete equipment pads. The estimated construction cost of this project is between $1,000,000 and $2,500,000. Contractor's Quality Control will be a requirement in this contract. The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 360 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bid sets will be available on/a August 7, 1995. Half-size plans and specifications will be furnished upon request. All requests for solicitation packages should be made in writing no later than 14 days prior to bid opening. After such time, packages will be furnished if supply is available. It has been determined that the number of sets be limited to 1 (one) per firm (additional copies will be the responsibility of the requestor). Please list street address (for parcel del service) and mailing address. SPECIAL NOTES: All responders are advised that this requirement may be cancelled or revised at any time during the solicitation, selection, selection evaluation, negotiation and/or final award structure and disposition of US Armed Forces. Small & Disadvantaged Businesses are encouraged to participate & will be used to maximum extent practicable as both prime & subcontractor. (0195)

Loren Data Corp. http://www.ld.com (SYN# 0158 19950717\Y-0020.SOL)


Y - Construction of Structures and Facilities Index Page