COMMERCE BUSINESS DAILY ISSUE OF AUGUST 3,1995 PSA#1402U.S. Forest Service, Mendocino National Forest, 825 N. Humboldt Avenue,
Willows, CA 95988, telephone 916-934-3316 Y -- LAKE RED BLUFF GROUP CAMPGROUND SOL R5-08-95-39 due 092095.
Contact Point, Contracting Officer, Pamela J. Thompson, 916-934-3316.
Furnish all labor, materials, and equipment to construct a group
campground containing two 34' by 44'' dining shelters, two 13' by 16'
slump stone vault toilet buildings, a 24' by 30' concrete block shower
building, an amphitheater, 0.2 miles of campground road, and 1500' of
concrete sidewalk. Work required an approximate quantities are: 1)
Install utilities consisting of 790' of 4'' water line, 660' of 2''
water line, 210' of 3/4'' water line, replace 550' of 480 volt 3 phase
feeder wires in buried conduit with larger conductors, install 790' of
480 volt 3 phases wires in buried conduit, install a main disconnect
and step down transformer in the shower building, install 600' of
subfeed wires in buried conduit, install a 3000 gallon septic tank with
375' of leach field, and install a 499 gallon propane tank with first
and second stage regulators, and50' of 3/4'' gas line. 2) Clear and
grub 1.5 acres for road, sidewalk, building and amphitheater
construction. Construct 0.2 miles of campground road using 300 tons of
hot bituminous plant mix and 1300 tons of aggregate base. Construct
1500' of concrete sidewalks. Install a steel pipe closure gate, 350
feet of wood fence, traffic control and information signs, and painted
traffic markings. 3) Install two 34' by 44' manufactured dining
shelters with concrete floors, storage area, picnic tables, serving
tables, barbecue grills, and electrical system. 4) Construct two mounds
requiring 800 cy of barrow each. Construct two slump stone vault
toilets on the mounds with electrical system and government supplied
vault aerator systems. 5) Construct a split face concrete block shower
building containing 6 shower units, 8 lavatories, 2 service sinks and
electrical system. 6) Excavate 60 cy for an earth amphitheater.
Construct 250 lineal feet of wood benches and install one street light.
Price range is between $250,000 and $500,000. Estimated issued date is
21 August 95 with a bid opening date of 20 September 95 at 2:30 p.m.
There is a $15 non-refundable fee for special project specifications
and drawings. No pre-bid tour is scheduled. This proposed procurement
is open to all businesses. (212) Loren Data Corp. http://www.ld.com (SYN# 0166 19950802\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|