COMMERCE BUSINESS DAILY ISSUE OF AUGUST 25,1995 PSA#1418Contract Administration Section, Procurement and Right-of-Way
Department, Takamatsu Construction Bureau, Japan Highway Public
Corporation, 4-1-3 Asahi-Machi, Takamatsu-Shi 760, Japan Y -- JAPAN: S16--- CONSTRUCTION POC Tel 81/878/23-2111 FAX N/A product
data a industry Sector code: s16--- B detailed product description:
Construction Title: phase-one Construction of the futami tunnel on the
matsuyama expressway; site: from kaminada, futami-cho, iyo-gun to
miaki, iyo-Shi, ehime-ken; summary: this Project involves Construction
of a tentatively two-lane Highway of 1,885 meters in length (earth
work volume, 336,000 cubic meters), including excavation of a tunnel
(one site, 1,631 meters); estimated work volumes: length, 1,885 meters;
width: Highway portion, 10.50 meters X 1; tunnel portion, 9.50 meters
X 1; earth work volume, 336,000 cubic meters; tunnel, one site, 1,631
meters; cross structure: culvert box, one site; culvert arch, one site;
main materials to be used: concrete, 16,000 cubic meters; reinforcing
steel, 400 tons; rock bolts, 15,000 pieces; steel arch bearings, 260
units; asphalt mixture, 100 tons; guardrail, 100 meters; Construction
period: 840 days. C product specifications/technical data: N/a (not
available) D quantity: N/a e U.S. dollar value: N/a F other
information: N/a response data a response language: Japanese. B best
Way to respond: letter. C from manufacturers only: N/a D information
desired from U.S. firm: N/a e primary buying factor: the lowest bid
within the estimated price range. F other information: pre-screening is
required to be eligible for bidding. Pre-screening deadline: 16:00 Pm,
sep. 8, 1995. Bid documents must be obtained directly from the
procuring agency, not from U.S. Embassy. Payment in yen. A issuing
agency: Takamatsu Construction Bureau (Japan Highway Public
Corporation) B financing agency: same as above. C price of bid
documents: N/a D purchase bid documents by: 16:00 Pm, sep. 8, 1995. E
Tender number required in all communications: N/A. F performance bonds
required: not required. G closed Procurement procedure: no. H bidding
procedures: open competitive Tender. I bid deadline: 13:30 Pm, oct.
30, 1995. J other information: '' kensetsu kogyo shimbun'': 8/8/95.
Eligible Tender participants: firms qualified to participate in bidding
for this Project must meet all of the following criteria and have their
qualification for this Project screened and confirmed by the director
of the Takamatsu Construction Bureau: 1) firms that do not fall under
article 4 of the Contract regulations of the Japan Highway Public
Corporation; 2) pre-qualified firms having a score of at least 1,500
points in civil Engineering work, or consortia comprised of two such
firms; 3) firms that have -- since 1985 (in the past 10 years), as the
main contractor -- constructed a Highway tunnel of at least one
kilometer in length and 50 square meters in planned inner Section area,
using the natm method. Note: only Construction projects in which
bidders have had a 20 percent or greater share of involvement are
eligible for consideration, and in the case of consortium, all member
firms must have the above- described experience; 4) firms that can
assign, to the Construction site, a field representative and a
full-time chief engineer or Engineering supervisor who have, since 1985
(in the past 10 years), constructed a tunnel using the natm method, as
field representative or chief engineer or Engineering supervisor; 5)
firms not suspended from designation in no. 7 zone by the Japan Highway
Public Corporation; 6) firms that can present an adequate plan for
tunneling; 7) in the case of consortium, every member firm must meet
the following criteria: a) has been in operation in qualified business
under the Construction business law for at least five years; B) can
assign -- to the Construction site, on a full-time basis -- an
Engineering supervisor qualified for this Project under the
Construction business law or a nationally-licensed chief engineer; and
C) has an at least 30 percent share of involvement, and the
representative firm must have the greatest share. Firms pre-screened by
the Construction minister regarding items (a) and (B) in evaluation of
their management operations are exempted from these criteria; and 8)
firms not related by capital or personnel to the contractors involved
in this Project. Post remarks Post contact/prepared by haomori approved
by gtaevs Please send a copy of your response to: Commercial Officer
(FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to
TC555. Please note: All correspondence with the Awarding Authority
and/or the Procuring Agency MUST be in Japanese.. (0235) Loren Data Corp. http://www.ld.com (SYN# 0067 19950824\Y-0003.SOL)
Y - Construction of Structures and Facilities Index Page
|
|