Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 19,1995 PSA#1434

U.S. Department of Labor, ETA, Division of Acquisition and Assistance, 200 Constitution Avenue, NW, Room S-4203, Washington, DC 20210

Z -- PY`93 - FIRE REPAIR DOOR AND FIRE ALARM UPGRADES (PHASE II) AT SHREVEPORT JOB CORPS CENTER Sol IFB-95-DAA-57-JC Due 110995 Contact Mike Marchand (318) 221-7117 or Marion Carter (202) 219-8706. The work to be performed under this project involves the repair of damage caused by a fire on the third floor of a dormitory building and structural repair to the roof framing. Also included in the work is the replacement of approximately 21,000 square feet of ceilings with drywall and acoustical title, replacement of the electrical, mechanical, and fire alarm systems, and roof repair work. The work also includes the extension of walls to the underside of the structure above to provide fire rated wall assemblies, window replacement, new floor finished, and painting. General clean-up from the fire is also a part of this work at the Shreveport Job Corps Center located in Shreveport, Louisiana. Construction time is scheduled for 196 calendar days to substantial completion. The estimated cost range for construction is between $500,000 to $1,000,000. Plans and specifications will be available on October 2, 1995, from the office of Demopulos and Ferguson, Inc., 401 Edwards, Suite 1600, Shreveport, Louisiana 71101-6141. Contact Mike Marchand (318) 221-7117 for additional information regarding this project. Collect calls will not be accepted. It is emphasized that requests for plans and specifications shall be directed to the A/E firm listed above to ensure proper handling of requests. All requests must be in writing. Plans and specifications are available for pick-up at the above A/E's office. Requests will be answered on a first-come, first serve basis until supplies are exhausted. For requests made after the supply is exhausted, the Contracting Officer may determine whether payment of a fee is warranted. The non-refundable fee shall not exceed the actual cost of duplication of the IFB documents, plus COD charges. A Pre-bid walk-through is scheduled for October 19, 1995 at 2:00 p.m. local time. Bid opening date is November 9, 1995 at 2:00 p.m. local time. This is a 100% Small Business Set-Aside acquisition. The SIC code is 1522 See Numbered Note(s): 1. (258)

Loren Data Corp. http://www.ld.com (SYN# 0087 19950918\Z-0001.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page