|
COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 18,1995 PSA#1454Centers for Disease Control and Prevention (CDC), Procurement & Grants
Office, 255 East Paces Ferry Road, N.E., Room No. 419 Atlanta, Georgia
30305 Z -- REPLACE POWER SLIDING DOOR SOL 96-18(Q) POC Contact Leroy King at
(404)842-6510 Z-Provide all necessary tools, labor, equipment,
materials and transportation to perform the following construction
work: Demolish the existing sliding door, supports and controls;
Provide and install new single sliding double panel door with one
breakaway door panel; Install steel tube bollard; Install metal closure
panel; Demolish existing electrical panels and wiring at the existing
door; and Install electrical wiring and panel boxes. This project will
be accomplished in phases. The first phase will require the door be
installed in a complete working condition over a one weekend period to
allow the door to be open during all working hours. Cost range of this
requirement is between $25,000 and $100,000. (0289) Loren Data Corp. http://www.ld.com (SYN# 0126 19951017\Z-0027.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|