|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 15,1995 PSA#1491Washington Metropolitan Area Transit Authority, (WMATA), Department of
Procurement, 600 Fifth Street, N.W., Washington, DC 20001 Y -- TRACK WORK SOL IFB-C-991/JDC DUE 013196 Sealed bids are solicited
for IFB C-991/JDC, Contract 1Z7086, for the installation of track,
special trackwork and contact rail for the Mid-City E Route between the
U Street-Cardozo Station and Fort Totten Statio. It includes the
welding and installation of 765 tons of Authority furnished standard
rail and 480 tons of Authority furnished high strength rail,
installation of one No. 10 double crossover, and the purchase and
installation of restraining rail, contact rail and associated
appurtenances. All installation will be direct fixation. Estimated cost
range is $5,000,000 to $15,000,000; work is to be completed by March
19, 1998. DBE goal is 21% for bids of $500,000 or more. Bid opening o/a
01/31/96. Contract specification $30, full size drawings $65, half size
contract drawings $40 each, insurance specs or safety program $5 each.
To purchase plans and specs call 202/269-4575, fax 202/635-6431 or
write to WMATA, Plans Room, 900 Franklin St., N.E., Washington, DC
20017. Technical questions call Chris Beres at 202/962-1510,
contractual questions call Jonathan Cole at 202/962-1710. (0347) Loren Data Corp. http://www.ld.com (SYN# 0096 19951214\Y-0007.SOL)
Y - Construction of Structures and Facilities Index Page
|
|