COMMERCE BUSINESS DAILY ISSUE OF APRIL 16,1996 PSA#1574General Services Administration, PBS,Fee Developer-6PC,1500 E
Bannister, Rm 2135,Kansas City,MO 64131-3088 Y -- DEMOLITION & SITE CLEARING SOL GS-06P-96-GZC-0504 DUE 061196 POC
Contact,Karen Poole,816/926-5316,Contracting Officer,Linda E.
Hale,816/926- 5316 Invitation for Bid Notice for Demolition & Site
Clearing, Federal Building & U.S. Courthouse, 17th to 19th Streets,
Douglas to Dodge Streets, Omaha, Nebraska. Job IFB NNE55112. IFB o/a
05/12/96. Estimated Cost Range: $1,000,000-$3,000,000. Time for
completion: 115 calendar days after receipt of notice to proceed. No
document charge or deposit is required. About the project: The site is
comprised of the entire eastern block, from 17th & 18th Streets, & th
ree-fourths (3/4) of the western block, from 18th & 19th Streets
between Dodge & Douglas Streets, in downtown Omaha, NE. The project
excludes St. Mary Magdalene Catholic Church on the northwest quarter
block of the western block. The project includes closing 18th Street
from Dodge to Douglas Streets. Project consists of, but is not limited
to: (1) Asbestos removal of fireproofing, floor tiles, piping
insulation and mudded joints; (2) Demolition of 85,000 square foot,
five-story old Omaha Branch of Federal Reserve Bank of Kansas City; (3)
Demolition of 105,000 square foot, seven-story Douglas Building (former
Masonic Temple); (4) Demolition of three-story, 20,000 square foot Bell
Federal Credit Union; (5) Site clearing of foundations from previously
demolished buildings now covered by parking lots; (6) Removal and
disposal of underground petroleum storage tanks and associated
petroleum impacted soil; (7) Temporary barriers and shoring; and (8)
Grading to preceed general construction contract for new Federal
Building and U.S. Courthouse. Old Omaha Branch of Federal Reserve Bank
of Kansas City was constructed in 1924 and extended in 1954. Douglas
Building (former Masonic Temple) was constructed in 1902. These
buildings may include architectural items worthy of salvage for
historic preservation. Any contractor or subcontractor performing
asbestos removal or underground petroleum storage tank and petroleum
impacted soil removal shall satisfy special responsibility and shall
provide bodily injury liability insurance written on the comprehensive
form of policy of at least $1,000,000 per occurrence. Such coverage
must encompass liabilities arising from work with hazardous materials
involved. Any contractor or subcontractor performing building implosion
or demolition shall satisfy special responsibility, provide bodily
insurance (of at least $500,000 per occurrence) and provide property
liability insurance (of at least $5,000,000) coverage written on the
comprehensive form of policy. The Government will not indemnify against
such risks. Any contractor or subcontractor performing
soils/geotechnical inspection services shall satisfy special
responsibility requirements. All responsible sources may submit a bid
which will be considered by the agency. To order plans and
specifications for this project, call 816-926-7881 and provide
necessary information. (0103) Loren Data Corp. http://www.ld.com (SYN# 0091 19960415\Y-0001.SOL)