COMMERCE BUSINESS DAILY ISSUE OF JUNE 3,1996 PSA#1607The Confederated Salish and Kootonai Tribes, Safety of Dams Office,
Tribal Complex, Highway 93, PO Box 278, Pablo, Montana 59855 Y -- MCDONALD DAM MODIFICATION - STAGE II (SOD) SOL CSKT/SOD 040 DUE
072996 POC Contact Mike Brown, (406) 676-2600 The Confederated Salish
and Kootenai Tribes require construction of McDonald Dam Modification
(SOD). Acquisition will be by a sealed bidding procurement method.
Features of the work include: (1) Embankment system, including:
replacement of main and right embankment portions of dam; excavating
existing embankment and outwash and glacial till foundation materials
and replacing with zoned earthfill, geotextile, geomembrane liner,
cover and riprap; constructing blanket drain, geomembrane drain, and
downstream toe drain for both embankments; and installing measurement
weirs, embankment measurement points, structure measurement points, and
vibrating wire piezometers. (2) Outlet works, including: removing
existing gate house and gate shaft and salvaging equipment; removing
outlet works, outlet portal and portions of the goose neck, conduit,
and canal lining; constructing upstream gate house; installing slide
gates and hoists; installing prefabricated steel footbridge; replacing
removed portions of conduit; installing steel outlet pipe and steel
bypass pipe inside conduit; and constructing outlet works stilling
basin and canal transition. (3) Spillway, including: removing and
replacing spillway, complete with underdrain system, hinged crest
gates, and hoist operators; replacing spillway bridge with precast,
prestressed concrete bridge; and installing complete electrical system.
(4) Wetlands mitigation, including: protecting and maintaining
downstream wetlands, and installing piping, valves, and structures for
wetlands water distribution system. (0151) Loren Data Corp. http://www.ld.com (SYN# 0178 19960531\Y-0009.SOL)