Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 11,1996 PSA#1613

USDA Forest Service, P.O. Box 25127, Lakewood, CO 80225

Y -- SOUTH PLATTE WATER SYSTEM SOL IFB R2-96-74 DUE 072996 POC Contact Barbara Hayden, 303/275-5273, Contracting Officer Thomas N. Turner, Jr. Project includes construction of an infiltration gallery, water transportation and distribution system, hydrants, valves, drain lines, rip-rap, concrete foundation, concrete block building, filtration chlorination and storage tank for one campground. Two campgrounds will include removal and disposing of existing concrete vault and pad, installation of new well system controls, well cap, waterlines, hydrants, valves, drain lines, rip-rap, electrical lines, concrete block building, water meter, chlorinator, electrical heater, new water hydrants, underground storage tank, and government furnished control panel. One optional campground may include the installation of waterlines, water hydrants, valves, drain lines and rip-rap. This project is located off Rampart Range Road #506, Pike & San Isabel National Forest, Jefferson County, Colorado. The estimated price range is between S100,000 and S250,000. Contract time is 120 days. All responsible sources may submit an offer which will be considered. (0159)

Loren Data Corp. http://www.ld.com (SYN# 0109 19960610\Y-0018.SOL)


Y - Construction of Structures and Facilities Index Page