COMMERCE BUSINESS DAILY ISSUE OF JUNE 21,1996 PSA#1621US ARMY ENGINEER DISTR, ALBUQ, CORPS OF ENGINEERS, 4101 JEFFERSON PLAZA
NE, ALBUQUERQUE NM 87109-3435 Y -- UPGRADE UTILITY SYSTEM, KIRTLAND AIR FORCE BASE, BERNALILLO
COUNTY, NEW MEXICO SOL DACA47-96-B-0027 DUE 082096 POC Contract
Specialist Phyllis M. Richardson (505) 342-3454 (Site Code DACA47)
Project includes removal and replacement of steam distribution lines
and gas distribution and service lines in part of Kirtland Air Force
Base. New steam lines are installed in a shallow cast-in-place concrete
trench system with removable covers. Steam line insulation is mineral
(glass) fiber in trenches and calcium silicate in pits and manholes.
Aluminum jacketing shall be provided over insulation. Project includes
limited asbestos abatement (where required) in manholes and pits and
of buried pipes which are removed. New gas mains and service lines are
polyethylene, with polyethylene valves. Project also includes pavement
crossings and patching, and relocation of utilities. Magnitude of
construction is between $5 and $10 million. Invitation for Bid
DACA47-96-B-0027 will be opened on or about 20 August 1996. Plans and
specifications will be available on or about 16 July 1996 at a total
cost of $125.00 per set. This charge is non refundable. For those
bidders previously on the Bidders Mailing List for DACA47-96-B-0010,
which was cancelled after opening, plans and specs will automatically
be sent to them at no additional charge. For new plan holders, checks
should be made payable to the F&A Officer, USAED, Ft Worth, and mailed
to the Contracting Division, 4101 Jefferson Plaza NE, Albuquerque, New
Mexico 87109. For technical questions, call Blaine Kemsley at (505)
342-3343. For information on ordering plans and specs, call Debby
Dickens at (505) 342-3460. The SIC Code is 1629. This acquisition is
unrestricted advertising, open to both large and small business
concerns. All responsible sources may submit a bid which shall be
considered. Bidders are advised that this requirement may be delayed,
cancelled or revised at any time during the solicitation process and/or
final award process and is subject to the availability of funds. If a
subcontracting plan is required, the following minimum subcontracting
goals will be applicable: Small Business Subcontracting - 60%, Small
Disadvantaged Business Subcontracting - 10%, Women Owned Small Business
- 5%.(0171) Loren Data Corp. http://www.ld.com (SYN# 0094 19960620\Y-0003.SOL)