Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 21,1997 PSA#1787

92d Contracting Squadron W. 110 Ent St. (Suite 200), Fairchild AFB, WA 99011-9403, Attn: Theodore D. Sweet, Director Of Business Programs

Z -- REPLACE SEWER, RT COMPOUND SOL F4561397Q0504 POC SrA Rich Middlebrook, (509)247-2069; Laurie D. Whelan, (509)247-2069 Replace sewer at Resistance Training Compound at Fairchild AFB, WA. Includes, but is not limited to: Demolish, remove, and legally dispose of off site and off base the existing septic tanks at buildings 1710, 1734, and at the south end of the Resistance Training Compound. Provide two new sewer pressure mound systems with associated septic tanks, gravity and pressure sewer lines, pump stations, service connections and electrical connections. Perform final clean-up of area to remove all demolition debris. Complete specifications shall be contained in the solicitation. Total performance period is 80 calendar days in two phases: Phase 1 shall be 35 calendar days to prepare, submit, and receive approval on required submittals; Phase 2 shall be 45 calendar days to occupy the work sites and physically accomplish work. Separate Notices to Proceed shall be issued for each phase. SIC is 1623. Small Business Size Standard is $17 million. Project magnitude is $25,000 to $100,000. Solicitation shall be issued as a written Request for Quotations utilizing Simplified Acquisition Procedures IAW FAR Part 13. Anticipated award date is 8 Apr 97. See Notes 1, and 26. (0050)

Loren Data Corp. http://www.ld.com (SYN# 0113 19970221\Z-0025.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page