COMMERCE BUSINESS DAILY ISSUE OF MARCH 13,1997 PSA#1801US Army, CECOM Acquisition Center, Ft. Monmouth, New Jersey 07703-5008 12 -- IMPROVED NIGHT DAY OBSERVATION FIRE CONTROL DEVICE(INOD) SOL
DAAB07-97-R-J534 DUE 041697 POC Point of Contact Jack
Lillie,703-704-3059. Contract Specialist Michael Tully, 908-532-5204,
Alex Matejka Contracting Officer, 908-532-5207. E-MAIL: IMPROVED
NIGHT-DAY OBSERVATION-FIRE CTR DEVICE (INOD),
matejkaa@doim6.monmouth.army.mil. The INOD CBD announcement is amended
to the following. Improved Night-Day Fire Control-Observation Device
(INOD). The INOD will provide the Special Operations Forces (SOF) with
an integrated day-night scope for medium and heavy sniper rifles as
well as strategic reconnaissance and observation. The INOD will
incorporate a third generation image intensifier (I=B2) tube with
direct view capability. The device will allow the sniper to view the
day and night channels simultaneously alleviating the necessity to flip
between a day and night channel. There will be two variants of the
sight; a Medium INOD and a Large INOD. The only difference between the
two versions will be the objective lenses. The current program
schedule consists of two phases of Engineering & Manufacturing
Development (E&MD) beginning in FY97 and ending in early FY99. A Single
cost plus award fee (CPAF) type contract will be awarded for the E&MD
phases. Three Medium and three Large INOD prototypes will be developed
during the first E&MD phase. Developmental Test and Evaluation (DT&E)
will include test, analyze and fix (TAAF) during E&MD phase I. The
TAAF test items will be INOD prototypes which will allow early
assessment of the degree to which the critical performance requirements
can be met. Representative user personnel will evaluate these early
prototypes and provide feedback for incorporation into the final
design. Six INOD prototypes of each size will be manufactured during
the second E&MD phase. The phase II test items will be pre-production
prototypes in a production configuration. The results of E&MD phase II
test and evaluation will be the basis for support of a Milestone III
production decision. After successful completion of E&MD phase I, it is
the Government will evaluate acquiring INOD production units from the
E&MD Contractor on a Sole Source basis. The INOD production phase
(Fixed price production with options) is scheduled to begin in FY99 and
end in FY01 with FY02 as a production optionyear. Anticipated
production quantity is 1,908 systems. A DRAFT Performance
Specification, Statement of Work with Contract Data Requirements List
and other data, and Sections L & M will be issued to CECOM's EBB. A
pre-solicitation conference and one-on-one meetings between Government
and industry is scheduled for 3-17 to 3-18-97 at PM NVRSTA, Ft.
Belvoir, VA (See pre-solicitation conference on EBB for details). An
Electronic Bulletin Board (EBB) posting has been established for use on
this acquisition to facilitate transmittal of information between
Government and industry. Critical solicitation information, including
draft and final solicitation requirements and schedules will be
provided via EBB. Oral presentations will be used. Cost as an
Independent Variable (CAIV) priciples will be utilized. Subcontracting
to small and small disadvantaged business will be a contract
requirement. (0069) Loren Data Corp. http://www.ld.com (SYN# 0162 19970313\12-0001.SOL)