COMMERCE BUSINESS DAILY ISSUE OF MAY 28,1997 PSA#1854USDA-Natural Resources Conservation Service, 101 South Main Street,
Temple, Texas Y -- FLOODWATER RETARDING STRUCTURE REPAIR -- CHAMBERS CREEK SOL
NRCS-13-TX-97 DUE 070997 POC Geoben A. Johnson, Contracting Officer
CORRECTION: This Project will consist of repairing the downstream
embankment slope and shaping the upstream embankment slope to remove
the stair step appearance. The slope will be converted from 2
horizontal to 1 vertical slope to 4 horizontal to 1 vertical slope,
will require additional pipe for the principal spillway, a plunge basin
will be installed as part of the repair. The repair work will consist
of approximately 46,961 cubic yards of compacted earthfill and 20,857
cubic yards of excavation, installation of 130 feet of R/C concrete
pipe, the placement of 17.4 cubic yards of reinforced concrete, the
placement of 870 tons of Rock riprap, and the construction of 2,890
feet of barbed wire fence. Estimated Price Range is $100,000.00 to
$250,000.00. IFB will be available on 4 Jun 1997. The Site showing will
be held on 18 June 1997 at 10:00 am local time at the NRCS Field Office
in Milford, Texas. Bids will be accepeted until 2:00 pm local time on
9 July 1997 All responsible sources may submit a bid which shall be
considered by the agency. FAX requests for the Bid package may be sent
to (817) or new one (254) 298-1295. (0143) Loren Data Corp. http://www.ld.com (SYN# 0113 19970528\Y-0021.SOL)