COMMERCE BUSINESS DAILY ISSUE OF JUNE 3,1997 PSA#1858DA, Tulsa District, Corps of Engineers, PO Box 61, Tulsa, OK
74121-0061 Y -- MILL CREEK CHANNEL AND DETENTION SITES, PHASE III, MINGO CREEK
LOCAL PROTECTION, TULSA, OKLAHOMA SOL DACW56-97-B-0028 DUE 072297 POC
Diane Cianci, Contracting Division, 918-669-7270 This work consists of
construction of approximately 1000 LF of perimeter subdrain system to
an existing detention facility, 300 LF of grass line ditching, 740 LF
of concrete ditching, 3500 SY of ground preparation and seeding, slab
sodding of disturbed areas, 170T of asphaltic street resurfacing,
drainage inlet grate, and placement of pole gates. Estimated cost range
of this project is $100,000 to $250,000. An advanced non-refundable fee
of $6.00 (half size) or $10.00 (full size) is required for each set of
specifications. Make check payable to F&A Officer, USAED, Tulsa, and
mail to the attention of Contracting Division. Payment must be received
prior to issuance of plans and specifications. Plans and specifications
will be available on or about 19 June 1997. No phone calls to order
please. All orders will be mailed via first-class mail. Requests for
special handling (Fed-X, etc.) will not be honored. (0150) Loren Data Corp. http://www.ld.com (SYN# 0137 19970603\Y-0026.SOL)