COMMERCE BUSINESS DAILY ISSUE OF JUNE 30,1997 PSA#1877Ministry of Defence, Procurement Executive, CB/SCSS1a, Cedar 3a, MoD
Abbey Wood #103, P.O. Box 702, BRISTOL, BS12 7DU, UNITED KINGDOM 18 -- SKYNET 5 NATIONAL PROGRAMME DUE 070797 POC Mr. D.J. Orpwood,
01144 11791 33274. Project definition study for the provision of the
next generation UK Military Satellite Communications System (SKYNET 5
NATIONAL PROGRAMME). SUMMARY OF REQUIREMENTS. Subject to the granting
of formal approvals the MoD plans to replace its SKYNET 4 military
satellite communications system, including the update and enhancement
of ground equipment. The ISD is 2005. The MoD wishes to conduct a
competitive two year programme of work to determine implementation
options. MoD wish to examine three ways of meeting their requirement,
namely: (a) International Project Definition (PD) collaborative
programme between UK/Ge/Fr for the supply and delivery in orbit of
satellites and the updating and enhancement of associated ground
equipment. (b) National PD programme for the supply and delivery in
orbit of satellites and the updating and enhancement of associated
ground equipment. (c) Provision of military satellite communications
service including the updating and enhancement of associated ground
equipment through aPrivate Finance Initiative (PFI) arrangement. This
announcement deals with the proposed invitation to tender for the
National programme. An ITT will be issued in parallel with those for
the international collaborative and PFI programmes referred to above.
The objective of this study is to define a satellite communications
system which meets the requirements of the system requirement
specification (SRS) as provided by MoD (PE). Following the competition,
a decision will be made to pursue either the international
collaborative programme or the national PD programmes, in parallel with
the PFI approach. The selection of the approach to be taken forward
into implementation will be made following the evaluation of the
results of the PFI Design Study and PD programmes. Project Definition
shall consider the space segment, ground segment, and system management
segment as a single integrated system. Activities to be performed as
part of Project Definition will include, but will not be limited to:
(a) Producing a detailed satellite management segment and ground system
designs to meet the SRS. (b) Producing detailed development plans. and
migration plans for the current UKMSCS to the new system to meet the
ISD of 2005. (c) Development of critical items and technology required
to allow initiation of the development and implementation work (Phase
C/D) after completion of Project Definition. (d) System support
analysis with regards to logistics? training and documentation. (e)
Provision of a detailed procurement specification for the development
and implementation phase. In order to achieve the 2005 ISD the MoD is
currently seeking approval to follow the following programme timeline:
late July 1997 invite tenders; late September 1997 receive bids; early
1998 contract let for Design Studies; end 1999 completion of Design
Studies; end 2000 contract let for the implementation phase; 2005 ISD
for the first satellite. Any firm wishing to tender for the prime
contractor role should convey its interest to the issuing branch by 9
July1997 explaining why they are competent. A further announcement will
be made when tenders are invited and at the time prospective
sub-contractors will be invited to register interest direct to the
prime contractors. (0177) Loren Data Corp. http://www.ld.com (SYN# 0240 19970630\18-0001.SOL)